Login | Register

Integration of Building Information Modeling (BIM) and Process Mining for Design Authoring Processes

Title:

Integration of Building Information Modeling (BIM) and Process Mining for Design Authoring Processes

Kouhestani, Sobhan (2019) Integration of Building Information Modeling (BIM) and Process Mining for Design Authoring Processes. Masters thesis, Concordia University.

[thumbnail of MSc_Thesis_Sobhan Kouhestani.pdf]
Preview
Text (application/pdf)
MSc_Thesis_Sobhan Kouhestani.pdf - Accepted Version
Available under License Spectrum Terms of Access.
5MB

Abstract

Building Information Modelling (BIM) corresponds to the generation and management of the digital representation for building products by wrapping building elements and their information in a unique source file. Open BIM, relying on platform-independent standards, such as IFC (Industry Foundation Classes), is supposed to increase the interoperability in the BIM environment. BIM, as a shared work platform in AEC (Architecture, Engineering and Construction) industry, can be upgraded to act as an Enterprise Resource Management (ERM) system and support data mining for the management of design and construction processes. ERM systems rely on transaction data, also known as “event logs”. eXtensibile Event Stream (XES) is an XML (Extensible Markup Language) schema aiming to provide a format for supporting the interchange of event logs. XES-based Event logs commonly include some semantics (called extensions) regarding events.
This work aims to enable BIM to act as an ERM system. To realize this goal, four research objectives were defined and achieved. First, an ‘IFC archiver algorithm’ was developed to take snapshots, on a regular basis, from different stages of building modeling process (performed in Autodesk Revit), throughout the design phase from start to the end. Second, an ‘IFC logger algorithm’ was created to consecutively compare archived IFC files, detect design activities and save them in the CSV format event log. Then, XESame module is used to map the CSV format event log to the appropriate data format for Process Mining (i.e., XES format event logs). The activities were categorized in five classes: Addition, Removal, Rotation, Relocation of elements (e.g., a wall), and changes in their properties (e.g., the size, type or family of an element). Five attributes for each activity were stored in the database. Those included: Element ID, Designer, Element Name (Name of the Activity), Start and End time of each activity. Third, Process Mining techniques were used to detect the as-happened processes. Last but not least, Process Mining helped to derive different types of design process information (analytics) such as social networks of actors, bottlenecks of processes and process deviations.
Two case studies were performed to validate and verify the research methodology. Around 300 and 30,000 events were captured respectively, during the design phase of our first and second case studies. Then, the activity log was fed to a Process Mining tool to mine the as-happened design processes. Two levels of process maps were discovered: As-happened level 2 and “level 3” BIM maps. As-happened maps were derived and represented in Petri net and process tree formats. Moreover, different types of animations of the as-happened design processes were derived for level 2 and “level 3” BIM maps from replaying the event logs on top of the captured processes. Those animations showed project paths, activities queue lengths and service times.
In a nutshell, the study successfully applied Process Mining on the foundation of BIM (as an ERM system) and accordingly made discovery, monitoring and optimizing BIM processes possible. The present study aims to assist BIM and project managers by enabling BIM as a management tool for design processes. These processes are important, because the design phase is at the early stage of every construction project.

Divisions:Concordia University > Gina Cody School of Engineering and Computer Science > Building, Civil and Environmental Engineering
Item Type:Thesis (Masters)
Authors:Kouhestani, Sobhan
Institution:Concordia University
Degree Name:M.A. Sc.
Program:Building Engineering
Date:18 March 2019
Thesis Supervisor(s):Nik-Bakht, Mazdak
Keywords:BIM processes, data mining, process mining, enterprise resource management, Design Authoring, IFC
ID Code:985149
Deposited By: Sobhan Kouhestani
Deposited On:17 Jun 2019 18:45
Last Modified:17 Jun 2019 18:45
Related URLs:

References:

REFERENCES

[1] K. Slowey, "The productivity 'train wreck': why construction struggles to compete with rival industries," 19 May 2016. [Online]. Available: http://www.constructiondive.com/news/the-productivity-train-wreck-why-construction-struggles-to-compete-with/419450/.
[2] S. Kouhestani and M. Nik-Bakht, "Towards level 3 BIM process maps with IFC & XES process mining," in The 12th European Conference on Project and Process Modelling (ECPPM 2018), Copenhagen, 2018.
[3] W. van der Aalst, "Business Process Simulation Revisited," Enterprise and Organizational Modeling and Simulation, vol. volume 63 of Lecture Notes in Business Information, pp. 1-14, 2010.
[4] P. S. University, "BIM project execution planning guide and templates-Version 2.0," CIC Research Group, Pennsylvania State University, State College, PA, USA, 2010.
[5] R. Quirijnen and S. van Schaijk, "Meten = Weten," Avans Hogeschool, Tilburg, 2013.
[6] J. Yang, M.-W. Park, P. Vela and M. Golparvar-Fard, "Construction performance monitoring via still images, time-lapse photos, and video streams: Now, tomorrow, and the future," Advanced Engineering Informatics, vol. 29, no. 2, pp. 211-224, 2015.
[7] W. van der Aalst, Process Mining: Discovery, Conformance and Enhancement of Business Processes, Heidelberg: Springer, 2011.
[8] IEEE, "Process mining case studies," 2013. [Online]. Available: http://www.win.tue.nl/ieeetfpm/doku.php?id=shared:process_mining_case_studies.
[9] A. Manuel , "Process mining - Ana Aeroportos de Portugal," BPTrends, 2012.
[10] A. Rozinat, R. S. Mans, M. Song and W. M. P. van der Aalst, "Discovering simulation models," Journal of Information Systems, vol. 34, no. 3, pp. 305-327, 2009.
[11] W. van der Aalst, Process mining - Data science in action, second edition, Eindhoven, The Netherlands: Springer, 2016.
[12] In Merriam-Webster's dictionary (11th ed.), Springfield, MA: Merriam-Webster, 2003.
[13] K. Jensen and L. Kristensen, Coloured Petri Nets, Berlin: Springer, 2009.
[14] W. Reisig and G. Rozengberg, Lectures on Petri Nets I: Basic Models, vol. volume 1491 of Lecture Notes in Computer Science, Berlin: Springer, 1998.
[15] M. Weske, Business Process Management: Concepts, Languages, Architectures., Berlin: Springer, 2007.
[16] W. van der Aalst, "Business Process Management Demystified: A Tutorial on Models, Systems and Standards for Workflow Management," Desel, vol. 3098, pp. 1-65, 2004.
[17] W. van der Aalst and C. Stahl, Modeling Business Processes: A Petri Net Oriented Approach, Cambridge, MA: MIT press, 2011.
[18] W. van der Aalst and K. M. Van Hee, Workflow Management: Models, Methods, and, Cambridge, MA: MIT Press, 2004.
[19] W. van der Aalst, "The Application of Petri Nets to Workflow Management," The Journal of Circuits, Systems and Computers, vol. 8, no. 1, pp. 21-66, 1998.
[20] W. van der Aalst, "Extracting event data from databases to unleash process mining," in Proceedings of BPM. Springer , 2015.
[21] "IDC iView. The Digital Universe Decade—Are You Ready?," International Data Corporation, Framingham, MA, 2010. [Online]. Available: http://www.emc.com/digital_universe.
[22] D. Hand, H. Mannila and P. Smyth, Principles of Data Mining, Cambridge, MA: MIT Press, 2001.
[23] W. van der Aalst, S. Guo and P. Gorissen, "Comparative Process Mining in Education: An Approach Based on Process Cubes," in 12th IFAC International Workshop on Discrete Event Systems, 2014.
[24] W. van der Aalst and A. Rozinat, "Conformance Checking of Processes Based on Monitoring," Information Systems, vol. 33, no. 1, pp. 64-95, 2008.
[25] J. Cook, D. Zhidian, C. Liu and A. Wolf, "Discovering models of behavior for concurrent," Computer in Industry, vol. 53, no. 3, pp. 297-319, 2004.
[26] J. Cook and A. Wolf, "Event-based detection of concurrency," ACM SIGSOFT Software Engineering, vol. 23, no. 6, pp. 35-45, 1998.
[27] R. Agrawal, D. Gunopulos and F. Leymann, "Mining process models from workflow logs," in 6th International Conference on Extending Database Technology, Heidelberg, 1998.
[28] S. Hwang and W. Yang, "On the discovery of process models from their instances," Decisision Support Systems, vol. 34, no. 1, pp. 41-57, 2002.
[29] G. Shimm, "Process miner - a tool for mining process schemes from event-based data," in JELIA 2002, Heidelberg, 2002.
[30] G. Schimm, "Mining most specific workflow models from event-based data," in BPM 2003, Heidelberg, 2003.
[31] W. van der Aalst, T. Weijters, J. Herbst, B. van Dongen, L. Maruster and G. Schimm, "Workflow mining: a survey of issues and approaches," Data Knowledge in Engineering, vol. 47, no. 2, pp. 237-267, 2003.
[32] W. van der Aalst and B. van Dongen, "Discovering workflow performance models from timed logs," in EDCIS 2002, Heidelberg, 2002.
[33] W. van der Aalst, T. Weijters and L. Maruster, "Workflow Mining: Which processes can be rediscovered?," Eindhoven University of Technology, Eindhoven, 2002.
[34] S. Pinter and M. Golani, "Discovering workflow models from activities’ lifespans," Computer in Industry, vol. 53, no. 3, pp. 283-296, 2004.
[35] M. Golani and S. Pinter, "Generating a process model from a process audit log," in BPM 2003, Heidelberg, 2003.
[36] W. van der Aalst and T. Weijters, "Rediscovering workflow models from event-based data using little thumb," Integrated Computer-Aided Engineering, vol. 10, no. 2, pp. 151-162, 2003.
[37] G. Greco, A. Guzzo and L. Pontieri, "Mining hierarchies of models: from abstract views to concrete specifications," in BPM 2005, Heidelberg, 2005.
[38] G. Greco, A. Guzzo and D. Saccá, "Mining expressive process models by clustering workflow traces," in PAKDD 2004, Heidelberg, 2004.
[39] A. de Medeiros, "Genetic Process Mining. Ph.d. thesis," Technische Universiteit Eindhoven, Eindhoven, 2006.
[40] W. van der Aalst, A. de Medeiros and T. Weijters, "Process Mining: Extending the α-Algorithm to Mine Short Loops," Eindhoven Universtiy of Technology, Eindhoven, 2004.
[41] W. van der Aalst, A. Weijters and L. Maruster, "Workflow Mining: Discovering Process Models from Event Logs," IEEE Transactions on Knowledge and Data Engineering, vol. 16, no. 9, pp. 1128-1142, 2004.
[42] C. Günther and W. van der Aalst, "Fuzzy Mining: Adaptive Process Simplificaiton Based on Multi-Perspective Metrics," in International Conference on Business Process Management (BPM 2007), Berlin, 2007.
[43] A. Weijters and J. Ribeiro, Flexible Heuristics Miner (FHM)., Eindhorven: Eindhoven University of Technology, 2010.
[44] W. van der Aalst, V. Rubin, H. Verbeek, B. van Dongen, E. Kindler and C. Günther, "ProcessMining: A Two-Step Approach to Balance Between Underfitting and Overfitting," Software and Systems Modeling, vol. 9, no. 1, pp. 87-111, 2010.
[45] E. Badouel and P. Darondeau, "Theory of Regions," Lectures on Petri Nets I: Basic Models, vol. volume 1491 of Lecture Notes in Computer Science, pp. 529-586, 1998.
[46] R. Bergenthum, J. Desel, R. Lorenz and S. Mauser, "Process Mining Based on Regions of," in International Conference on Business Process Management (BPM 2007), Berlin, 2007.
[47] J. Carmona and J. Cortadella, "Process Mining Meets Abstract Interpretation," in ECML/PKDD 2010, Berlin, 2010.
[48] J. van der Werf, B. van Dongen, C. Hurkens and A. Serebrenik, "Process Discovery Using Integer Linear Programming," Fundamenta Informaticae, vol. 94, pp. 387-412, 2010.
[49] A. de Medeiros, A. Weijters and W. van der Aalst, "Genetic Process Mining: An Experimental Evaluation," Data Mining and Knowledge Discovery, vol. 14, no. 2, pp. 245-304, 2007.
[50] S. Leemans, D. Fahland and W. van der Aalst, Process and Deviation Exploration with Inductive visual Miner, Eindhoven: Eindhoven University of Technology, 2014.
[51] S. Leemans, "Inductive Visual Miner manual (ProM 6.7)," 2017.
[52] P. Dinaz and D. Ferreira, "Automatic Extraction of Process Control Flow from I/O Operations," Business Process Management (BPM 2008), vol. volume 5240 of Lecture Notes in Computer Science, pp. 342-357, 2008.
[53] S. van Schaijk, "Case study: Construction design process mining," Eindhoven University of Technology, Eindhoven, 2016.
[54] S. van Schaijk, BIM based process mining: Enabling knowledge reassurance and fact-based problem discofery within AEC industry, Eindhoven: Eindhoven University of Technology, 2016.
[55] S. van Schaijk, "Case study: Process Mining with facility management data," Eindhoven University of Technology, Eindhoven, 2015.
[56] C. W. Günther and E. Verbeek, "XES Standatd Definition," Technische Universiteit Eindhoven University of Technology, Eindhoven, 2014.
[57] C. Günther, XES Standard Definition, 2009.
[58] C. W. Günther and E. Verbeek, "OpenXES Standard Definition," Eindhoven, Technische Universiteit Eindhoven University of Technology, 2014.
[59] C. W. Günther and E. Verbeek, "OpenXES Developer Guide," Eindhoven University of Technology, Eindhoven, Netherlands, 2014.
[60] ProM, 20 Apr 2018. [Online]. Available: http://www.promtools.org/doku.php.
[61] Celonis, 20 Apr 2018. [Online]. Available: https://www.celonis.com/.
[62] Fluxicon, "Disco," 20 Apr 2018. [Online]. Available: https://fluxicon.com/disco/.
[63] myinvenio, "Process Mining Vision," myinvenio.com, [Online]. Available: https://www.my-invenio.com/process-mining-vision/. [Accessed 20 Apr 2018].
[64] Lana, 20 Apr 2018. [Online]. Available: https://lana-labs.com/en/.
[65] J. Buijs, "Mapping Data Sources to XES in a Generic Way, Master Thesis," Eindhoven University of Technology, Eindhoven, 2010.
[66] A. Rozinat and W. van der Aalst, "Decision Mining in ProM," in International Conference on Business Process Management (BPM 2006), Berlin, 2006.
[67] J. Desel, W. Reisig and G. Rozenberg, "Lectures on Concurrency and Petri Nets," Lectures on Concurrency and Petri Nets, vol. volume 3098 of Lecture Notes in Computer Science, 2004.
[68] S. Wasserman and K. Faust, Social Network Analysis: Methods and APolications, Cambridge: Cambridge University Press, 1994.
[69] W. van der Aalst, H. Reijers and M. Song, "Discovering Social Networks from Event Logs," Computer Supported Cooperative Work, vol. 14, no. 6, pp. 549-593, 2005.
[70] M. Song and W. van der Aalst, "Towards Comprehensive Support for Organizational Mining," Decision Support Systems, vol. 46, no. 1, pp. 300-317, 2008.
[71] W. van der Aalst, M. Pesic and M. Song, "Beyond Process Mining: From the Past to Present and Future," in Proceedings of the 22nd International Conference on Advanced Information Systems Engineering (CAiSE’10), Berlin, 2010.
[72] W. van der Aalst, M. Schonenberg and M. Song, "Time Prediction Based on Process Mining," Information Systems, vol. 36, no. 2, pp. 450-475, 2011.
[73] J. Goedert and P. Meadati, "Integrating Construction Process Documentation into Building Information Modeling," Journal of Construction Engineering and Management, vol. 134, no. 7, pp. 509-516, 2008.
[74] S. Azhar, A. Nadeem, J. Mok and B. Leung, "Building Information Modeling (BIM): A New Paradigm for Visual Interactive Modeling and Simulation for Construction Projects," in First International Conference on Construction in Developing Countries (ICCIDC–I), Karachi, Pakistan, 2008.
[75] Y. Rezgui, C. Hopfe and C. Vorakulpipat, "Generations of knowledge management in the architecture, engineering and construction industry: An evolutionary perspective," Advanced Engineering Informatics, vol. 24, pp. 219-228, 2010.
[76] D. Bryde, M. Broquetas and J. Volm, "The project benefits of Building Information Modelling (BIM)," International Journal of Project Management, vol. 31, no. 7, pp. 971-980, 2013.
[77] G. Ballard and L. Koskela, "On the Agenda of Design Management Research," in IGLC, Guaruja, Brazil, 1998.
[78] G. Ballard, "Positive vs. negative iteration in design," in the 8th International Group for Lean Construction Annual Conference, Brigthon, UK, 2000.
[79] M. Al Hattab and F. Hamzeh, "Simulating the dynamics of social agents and information flows in BIM-based design," Automation in Construction, vol. 92, pp. 1-22, 2018.
[80] H. Kim and F. Grobler, "Design Coordination in Building Information Modeling (BIM) Using Ontological Consistency Checking," in ASCE Computing in Civil Engineering, Austin, Texas, 2009.
[81] C. Baoping, W. Wei and H. Xin, A Research on Construction Project Based on BIM, IEEE, 2010.
[82] S. Azhar, "Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC industry," Leadership and Management in Engineering, vol. 11, no. 3, pp. 241-252, 2011.
[83] T. Hartmann, H. van Meerveld, N. Vossebeld and A. Adriaanse, "Aligning building information model tools and construction management methods," Automation in Construction, vol. 22, pp. 605-613, 2012.
[84] S. Azhar and J. Brown, "BIM for Sustainability Analyses," International Journal of Construction Education and Research, vol. 5, no. 4, pp. 276-292, 2009.
[85] A. Kiviniemi and R. Codinhoto, "Challenges in the Implementation of BIM for FM—Case Manchester Town Hall Complex.," in Computing in Civil and Building Engineering, Orlando, Florida, 2014.
[86] Y. Jiao, Y. Wang, S. Zhang, Y. Li, B. Yang and L. Yuan, "A cloud approach to unified lifecycle data management in architecture, engineering, construction and facilities management: Integrating BIMs and SNS.," Advanced Engineering Informatics, vol. 27, no. 2, pp. 173-188, 2013.
[87] K. Ammari and A. Hammad, "Collaborative BIM-Based Markerless Mixed Reality Framework for Facilities Maintenance.," in Computing in Civil Engineering, Orlando, Florida, 2014.
[88] Y. Arayici, "Towards building information modelling for existing structures.," Structural Survey, vol. 26, no. 3, pp. 210-222, 2008.
[89] K. Jaakko, "Co-ordination of Plans and Needs for Information Exchange in a Data Modeled," Aalto University, Dipoli, Finland, 2014.
[90] L. Seng, Singapore BIM Guide Version 2, Singapore Building and Construction Authority, 2013.
[91] M. Kassem, N. Iqbal and N. Dawood, "A practice oriented BIM framework and workflows," Computing in Civil Engineering, pp. 524-532, 2013.
[92] M.-H. Tsai, A. M. Md, S.-C. Kang and S.-H. Hsieb, "Workflow re-engineering of design-build projects using a BIM tool," Journal of the Chinese Institute of Engineering, pp. 88-102, 2014.
[93] B. Hola, "Identification and evaluation of processes in a construction enterprise," Archives of Civil and Mechanical Engineering, vol. 15, pp. 419-425, 2015.
[94] B. Golzarpoor, C. T. Haas and D. Rayside, "Improving process conformance with industry founcation processes (IFP)," Advanced Engineering Informatics, vol. 30, pp. 143-156, 2016.
[95] USACE, "USACE BIM project execution plan, Version 1.0," U.S. ARmy Corps of Engineers, Washington DC, U.S., 2010.
[96] buildingSMART Alliance, "National BIM standard-United States (NBIMS-US), Version 3," National Institute of Building Science, Washington, DC, U.S., 2015.
[97] A. Khanzode, M. Fischer and D. Reed, "Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical and plumbing (MEP) system on a large healthcare project," ITCon, vol. 13, pp. 324-342, 2008.
[98] S. Coates, Y. Aryaici, L. Koskela and K. O'Reilly, "The key performance indicators of the BIM implementation process," in Computing in civil and building engineering, Nottingham, 2010.
[99] E. A. Poirier, S. Staub-French and D. Forgues, "Assessing the performance of the building information modeling (BIM) implementation process within a small specialty contracting enterprise," Canadian Journal of Civil Engineering, vol. 42, no. 10, pp. 766-778, 2015.
[100] "buildingSmart," [Online]. Available: https://www.buildingsmart.org/. [Accessed 1 November 2018].
[101] A. Gupta, A. Cemesova, C. J. Hopfe, Y. Rezgui and T. Sweet, "A conceptual framework to support solar PV simulation using an open-BIM data exchange standard," Automation in Construction.
[102] T. Froese, "INDUSTRY FOUNDATION CLASS MODELING FOR ESTIMATING AND SCHEDULING," in Durability of Building Materials and Components 8, Vancouver, 1999.
[103] J. Tah, V. Carr and R. Howes, "Information modelling for case-based construction planning of highway bridge projects," Advances in Engineering Software, vol. 30, no. 7, pp. 495-509, 1999.
[104] T. Froese, "Models of Construction Process Information," Journal of Computing in Civil Engineering, vol. 10, no. 3, pp. 183-193, 1996.
[105] M. Hassanain, T. Froese and D. Vanier, "Development of a maintenance management model based on IAI standards," Artificial Intelligence in Engineering, vol. 15, pp. 177-193, 2001.
[106] T. Liebich, "IFC 2x Edition 3 Model Implementation Guide," buildingSMART International Modeling Support Group, 2009.
[107] T. Liebich, "Unveiling IFC2x4 - The next generation of OPENBIM.," 2010.
[108] C. Groome, "IFC Certification 2.0: Specification of Certification Process," pp. 1-7, 2010.
[109] T. Liebich, "Unveiling IFC2X4 - The Next Generation of OpenBIM," in CIB W78 2010: 27th International Conference, Cairo, Egypt, 2010.
[110] J. Won, G. Lee and C. Cho, "No-Schema Algorithm for Extracting a Partial Model from an IFC Instance Model," Computing in Civil Engineering, vol. 27, no. 6, pp. 585-592, 2013.
[111] Y. Adachi, "Overview of partial model query language," 22 05 2002. [Online]. Available: http://cic.vtt.fi/projects/ifcsvr/. [Accessed 15 Oct. 2009].
[112] Y.-S. Hwang, "Automatic quantity takeoff from drawing through IFC mopel," Architectural Institute of Korea, vol. 20, no. 12, pp. 89-98, 2004.
[113] P.-H. Chen, L. Cui, C. Wan, Q. Yang, S. Ting and R. Tiong, "Implementation of IFC-based web server for collaborative building design between architects and structural engineers," Automation in Construction, vol. 14, no. 1, pp. 115-128, 2005.
[114] W. Jeong, J. Kim, M. Clayton, J. Haberl and W. Yan, "Translating Building Information Modeling to Building Energy Modeling Using Model View Definition," The Scientific World Journal, vol. 2014, p. Article ID 638276, 2014.
[115] S. Pinheiro, J. O'Donnell, R. Wimmer, V. Bazjanac, S. Muhic, T. Maile, J. Frisch and C. van Treeck, "Model View Definition for Advanced Building Energy Performance Simulation," in CESBP/BauSIM 2016 Conference, Dresden, Berlin, 2016.
[116] J. Patacas, N. Dawood and M. Kassem, "Evaluation of IFC and Cobie as data sources for asset register creation," in 14th International Conference on Construction Applications of Virtual Reality, Sharjah, UAE, 2014.
[117] "IFC Extended Coordination View," buildingSMART Alliance, 2011. [Online]. Available: http://buildingsmart-tech.org/specifications/ifc_specification/ifc-view-definition/coordination-view/summary.
[118] W. Solihin, C. Eastman and Y. Lee, "Toward robust and quantifiable automated IFC quality validation," Advanced Engineering Informatics, vol. 29, no. 3, pp. 739-756, 2015.
[119] R. Lipman, M. Palmer and S. Palacios, "Assessment of conformance and interoperability testing methods used for construction industry product models," Automation in Construction, vol. 20, no. 4, pp. 418-428, 2011.
[120] "IFC 2x3 Coordination View 2.0 Sub schema," builidingSMART International Ltd., 2013. [Online]. Available: http://www.buildingsmart-tech.org/specifications/ifc-view-definition/coordination-view-v2.0/sub-schema. [Accessed 15 1 2019].
[121] J. Plume and J. Mitchell, "Collaborating design using a shared IFC building model_Learning from experience," Automation in Construction, vol. 6, no. 1, pp. 28-36, 2007.
[122] V. Singh, N. Gu and X. Wang, "A theoretical framework of a BIM-based multi-disciplinary collaboration platform," Automation in Construction, vol. 20, no. 2, pp. 134-144, 2011.
[123] M. Shafiq and S. Lockley, "Signature-based matching of IFC models," in 35th International Symposium on Automation and Robotics in Construction (ISARC), Berlin, Germany, 2018.
[124] E. Hjelseth and N. Nisbet, "Overview of concepts for model checking," in Proceedings of the CIB W78: 27th International Conference, Cairo, Egypt, 2010.
[125] A. Kiviniemi, M. Fischer and V. Bazjanac, "Multi-model Environment: Links between Objects in Different Building Models," in In Proceedings to the 22nd Conference on Information Technology in Construction CIB W78, Dresden, Germany, 2005.
[126] M. Nour and K. Beucke, "An Open Platform for Processing IFC Model Versions," Tsinghua Science & Technology, vol. 13, pp. 126-131, 2008.
[127] E. East, N. Nisbet and J. Wix, "Lightweight Capture of As-Built Construction Information," in 26th International Conference on IT in Construction, Istanbul, Turkey, 2009.
[128] X. Shi, Y. S. Liu, G. Gao, M. Gu and H. Li, "IFCdiff: A content-based automatic comparison approach for IFC files," Automation in Construction, vol. 86, pp. 53-68, 2018.
[129] H. Ma, K. Ha, C. Chung and R. Amor, "Testing semantic interoperability," in Proceedings of the Joint International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 2006.
[130] Y. Jeong, C. Eastman, R. Sacks and I. Kaner, "Benchmark tests for BIM data exchanges of precast concrete," Automation in Construction, vol. 18, no. 4, pp. 469-484, 2009.
[131] G. Arthaud and J. C. Lombardo, "Automatic Semantic Comparison of STEP Product Models," in Innovations in Design & Decision Support Systems in Architecture and Urban Planning, Dordrecht, Netherlands , 2006.
[132] "AIA East Tennessee," [Online]. Available: https://www.aiaetn.org/find-an-architect/design-to-construction/. [Accessed 22 3 2019].
[133] "BIMVision," datacomp, [Online]. Available: https://bimvision.eu/en/free-ifc-model-viewer/. [Accessed 16 11 2018].
[134] H. Pham, Software Reliability, Springer, 2000.
[135] J. Cortadella, M. Kishinevsky, L. Lavagno and A. Yakovlev, "Deriving Petri Nets from Finite," IEEE Transactions on Computers, vol. 47, no. 8, pp. 859-882, 1998.
[136] M. Dumas, W. van der Aalst and A. ter Hofstede, Process-Aware Information Systems: Bridging People and Software through Process Technology, New York: Wiley, 2005.
[137] A. Ehrenfeucht and G. Rozenberg, "Partial (Set) 2-Structures—Part 1 and Part 2," Acta Informatica, vol. 27, no. 4, pp. 315-368, 1989.
[138] D. Ferreira and D. Gillbald, "Discovering Process Models from Unlabelled Event Logs," in Business Process Management (BPM 2009), Berlin, 2009.
[139] A. Burattin, Process Mining Techniques in Business Environment, Heidelberg: Springer, 2015.
[140] S. Austin, A. Newton, J. Steele and P. Waskett, "Modelling and managing project complexity," International Journal of Project Management, vol. 20, pp. 191-198, 2002.
[141] A. Lapinski, M. Horman and D. Riley, "Lean Processes for Sustainable Project Delivery," Journal of Construction Engineering and Management, vol. 132, no. 10, pp. 1083-1091, 2006.
[142] W. van der Aalst, H. Reijers and M. Song, "Discovering Social Networks from Event Logs," Computer Supported Cooperative Work, vol. 14, no. 6, pp. 549-593, 2005.
All items in Spectrum are protected by copyright, with all rights reserved. The use of items is governed by Spectrum's terms of access.

Repository Staff Only: item control page

Downloads per month over past year

Research related to the current document (at the CORE website)
- Research related to the current document (at the CORE website)
Back to top Back to top