Two prototype thermocontrolled tanks were manufactured in the laboratory. Test results showed that liquid gaseous fuel can be brought from atmospheric pressure to the high pressure required for direct injection in a reasonable time and that the pressure increase can be to some extent limited by an appropriate insulation.