References [1] Alaba F., Othman M., Hashem I., Alotaibi F. (2017). Internet of things security: A survey. Journal of Network and Computer Applications, 88, 10-28. [2] Alba, E., Laguna, M., Luque, G. Workforce planning with parallel genetic algorithm. Retrieved February 2018 from https://pdfs.semanticscholar.org/4b4e/aae134c26f9e530d7b768410d1aad5c819ea.pdf [3] Abotaleb, I., Moussa, M., Hussain, S. (2014). Optimization of Allocating Multi-Skilled Labor Resources Using Genetic Algorithms. CSCE General Conference, 175, 1-9. [4] Afshari, A., Mojahed, M., & Yusuff, R. M. (2010). Simple additive weighting approach to personnel selection problem. International Journal of Innovation, Management and Technology, 1(5), 511. [5] Albach, H., Meffert, H., Pinkwart, A., Reichwald, R. Management of permanent change. Retrieved from https://link.springer.com/book/10.1007/978-3-658-05014-6. [6] Algethami, H., Pinheiro, R.L., Landa-Silva, D. (2016). A Genetic Algorithm for a Workforce Scheduling and Routing Problem. IEEE Congress on Evolutionary Computation(CEC),927-934. Retrieved February 2018 from https://ieeexplore.ieee.org/document/7743889/. [7] Alguliyev, R. M., Aliguliyev, R. M., & Mahmudova, R. S. (2015). Multicriteria personnel selection by the modified fuzzy VIKOR method. The Scientific World Journal, Retrieved December 2018, https://www.hindawi.com/journals/tswj/2015/612767/abs/. [8] Askin, R.G., Huang, Y. (1997). Employee training and assignment for facility reconfiguration. Proceedings of Industrial Engineering Research Conference,426. Retrieved March 2018 from https://asu.pure.elsevier.com/en/publications/employeetraining- and-assignment-for-facility-reconfiguration. [9] Asl, M.B., Khalolzadeh, A., Youshanlouei, H.R., Mood, M.M. (2012). Identifying and ranking the effective factors on selecting Enterprise Resource Planning(ERP) system using the combined Delphi and Shannon Entripy approach. Procedia- Social and Behavioural Sciences, 41,513-520. [10] Baležentis, A., Baležentis, T., & Brauers, W. K. (2012). Personnel selection based on computing with words and fuzzy MULTIMOORA. Expert Systems with applications, 39(9), 7961-7967. [11] Barlatt, A.Y. (2009). Models and algorithms for workforce allocation and utilization (Doctoral dissertation), University of Michigan. Retrieved January 2018 from https://deepblue.lib.umich.edu/handle/2027.42/63864. [12] Benesova, A., and Tupa, J. (2017). Requirements for education and qualification of people in industry 4.0. 27th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM2017, 11, 2195-2202. [13] Bhadury, J., Mighty, EJ., Damar, H. (2000). Maximizing workforce diversity in project teams: A network flow approach. International Journal of Management Science, 28,143–153. [14] Bley, K., Leyh, C. (2016). Digitization of German enterprises in the production sector- do they know how digitized they are.22nd Americas Conference on Information System,1-10. Retrieved November 2017 from https://www.researchgate.net/publication/305661673_Digitization_of_German_Enter prises_in_the_Production_Sector_-_Do_they_know_how_digitized_they_are. [15] Brettel M., Friederichsen N., Keller M., Rosenberg M. (2014). How virtualization, decentralization and network building change the manufacturing landscape: an industry 4.0 perspective. World Academy of Science, engineering and 79 Technology International journal of information and communication engineering, 8(1), 37-44. [16] Bruecker P., Bergh J., Belien J., Demeulemeester E. (2015). Workforce planning incorporating skills: State of the art. European Journal of operational Research, 243(1), 1-16. [17] Bohanec, M., Rajkovi, V. Knowledge acquisition and explanation for multiattribute decision making, Yugoslavia. Retrieved from http://kt.ijs.si/MarkoBohanec/pub/Avignon88.pdf. [18] Boran, F. E., Genç, S., & Akay, D. (2011). Personnel selection based on intuitionistic fuzzy sets. Human Factors and Ergonomics in Manufacturing & Service Industries, 21(5), 493-503. [19] Boran, F. E., Genç, S., Kurt, M., & Akay, D. (2009). A multi-criteria intuitionistic fuzzy group decision making for supplier selection with TOPSIS method. Expert Systems with Applications, 36(8), 11363-11368. [20] Bouajaja, S., Dridi, N. (2017). A survey on human resource allocation problem and its applications. Operational Research, 17(2), 339-369. [21] Buer, S. V., Strandhagen, J. O., & Chan, F. T. (2018). The link between Industry 4.0 and lean manufacturing: mapping current research and establishing a research agenda. International Journal of Production Research, 56(8), 2924-2940. [22] Cai, X., Li, K.N. (2000). A genetic algorithm for scheduling staff of mixed skills under multi-criteria. European Journal of Operational Research, 125(2), 359-369. [23] Celaschi, F. (2017). Advanced design-driven approaches for an industry 4.0 framework: The human-centred dimension of the digital industrial revolution. Strategic Design Research Journal, 10, 97-104. [24] Celik, N., Lee, S., Mazhari, E., Son, YJ., Lemaire, R., Provan, K. (2011), Simulation-based workforce assignment in a multi-organizational social network for alliance-based software development. Simulation Modelling Practice and Theory, 19, 2169–2188. [25] Cert, A., Enea, M., Galante, G., Manuela, C. (2009). Multi-objective human resources allocation in R & D projects planning. International Journal of Production Research, 47(13), 3503-3523. [26] Cesani, V.I., Steudel, H.J. (2005). A study of labor assignment flexibility in cellular manufacturing systems. Computers and Industrial Engineering, 48,571-591. [27] Chen, J.Y., Tai, K.C., Chen, G.C. (2017). Application of programmable logic controller to build-up an intelligent industry 4.0 platform. Procedia CIRP, 63,150-155. [28] Chryssolouris, G., Mavrikios, D., Papakostas, N., Mourtzis, D., Michalos, G., Georgoulias, K. (2009). Digital manufacturing: History, perspectives, and outlook. Proceedings of Institution of Mechanical Engineers, 223,451-462. [29] Colarelli, S.M., Boos, A.L. (1992). AL. Sociometric and ability-based assignment to work groups: Some implications for personnel selection. Journal of Organizational Behaviour, 13,187–196. [30] Collard, P., Gaspar. A., Clergue, M., Escazut, C. (1998). Fitness Distance Correlation, as statistical measure of Genetic Algorithm difficulty, revisited. European conference on Artificial Intelligence.927-93. Retreived March 2018from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.28.2481&rep=rep1&type=p df. [31] Crispim, J. A., & Pinho de Sousa, J. (2009). Partner selection in virtual enterprises: a multi-criteria decision support approach. International Journal of Production Research, 47(17), 4791-4812. 80 [32] Cuevas, R., Ferrer, J. C., Klapp, M., Muñoz, J. C. (2016). A mixed integer programming approach to multi-skilled workforce scheduling. Journal of Scheduling, 19(1), 91-106. [33] Dağdeviren, M. (2010). A hybrid multi-criteria decision-making model for personnel selection in manufacturing systems. Journal of Intelligent Manufacturing, 21(4), 451-460. [34] Dağdeviren, M., & Yüksel, İ. (2007). Personnel selection using analytic network process. İstanbul Ticaret Üniversitesi Fen Bilimleri Dergisi, 6(11), 99-118. [35] Daghouri, A., Mansouri, K., Qbadou, M. (2018). Information system performance evaluation and optimization using AHP and TOPSIS: Construction industry case. 4th International Conference on Optimization and Applications(ICOA). Retrieved June 2018 from https://ieeexplore.ieee.org/document/8370589/. [36] Dilberoglu, U.M., Gharehpapagh, B., Yaman, U., Dolen, M.et al. (2017). The role of additive manufacturing in the era of Industry 4.0. 27th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM2017, 11,545-554. [37] Dulmin, R., Mininno, V. (2003). Supplier selection using a multi-criteria deciaion aid method. Journal of Purchasing and Supply Management .9(4), 177-187. [38] Dursun, M., & Karsak, E. E. (2010). A fuzzy MCDM approach for personnel selection. Expert Systems with applications, 37(6), 4324-4330. [39] Efe, B. (2016). An integrated fuzzy multi criteria group decision making approach for ERP system selection. Applied Soft Computing. 38, 106-117. [40] Eitzen, G, Panton, D, Mills, G. (2004). Multi-Skilled Workforce Optimization. Annals of Operations Research, 217, 359–372. [41] Erol, S., Schumacher, A., Sihn, W. (2015). Strategic guidance towards Industry 4.0 – a three-stage process model. International Conference on Competitive Manufacturing, Retrieved September 2017 from http://publica.fraunhofer.de/documents/N-382579.html. [42] Farahani et al. (2016). Car sales forecasting using neural networks and analytical hierarchy process. The fifth international conference on Data analytics, USA, 57-62. [43] Fettermann, D. C., Cavalcante, C. G. S., Almeida, T. D. D., & Tortorella, G. L. (2018). How does Industry 4.0 contribute to operations management?. Journal of Industrial and Production Engineering, 35(4), 255-268. [44] Flatt, H., Schriegel, S., Jasperneite, J., Trsek, H., Adamczyk, H. (2016). Analysis of the Cyber-Security of industry 4.0 technologies based on RAMI 4.0 and identification of requirements. IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA). Retrieved March 2018 from https://ieeexplore.ieee.org/document/7733634/. [45] Forman, E., Peniwati, K., (1998). Aggregating individual judgements and priorities with the analytical hierarchy process. European Journal of Operational Research, 108(1), 165-169. [46] Fini, A.A.F., Rashidi, T.H., Akbarnezhad, A., Waller S.T. (2015). Incorporating multiskilling and learning in the optimization of crew composition. Journal of Construction Engineering and Management, 142(5), 1-14. [47] FitzHugh, K.L.M., Piercy, N.F. (2013). Does collaboration between sales and marketing affect business performance? 207-220. Retrieved May 2018 from https://www.tandfonline.com/doi/abs/10.2753/PSS0885-3134270301. 81 [48] Fowler, J.F., Wirojanagud, P., Gel, E.S. (2008), Heuristics for workforce planning with worker differences. European Journal of Operational Research, 190, 724–740. [49] Geissbauer, R., Schrauf, S. (2018). Industry 4.0: building the digital enterprise. Global Digital Operations Study, Retrieved August 2017 from https://www.pwc.com/gx/en/industries/industry-4-0.html. [50] Gerbert, P., Lorenz, M., Rubmann, M. (2015). Industry 4.0: the future of productivity and growth in manufacturing industries. The Boston Consulting Group. Retrieved August 2017 from https://www.bcg.com/enca/publications/2015/engineered_products_project_business_ industry_4_future_productivity_growth_manufacturing_industries.aspx. [51] Gokalp, M.O., Kayabay, K., Akyol, M.A., Eren, P.E., Kocyigit, A. (2016). Big data for industry 4.0: A conceptual framework. International Conference on Computational Science and Computational Intelligence(CSCI), 431-434. [52] Gomar, JE., Haas, CT., Morton, DP. (2002). Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128, 103-109. [53] Gorecky, D., Schmitt, M., Loskyll, M., Zuhlke, D. (2014). Human-machineinteraction in the industry 4.0 era. 12th IEEE International Conference on Industrial Informatics(INDIN). Retreived June 2018 from from https://www.researchgate.net/publication/286571545_Human-machineinteraction% 20in%20the%20industry%2040%20era. [54] Gunasekaran A., Subramanian N., Papadopoulos T. (2017). Information technology for competitive advantage within logistics and supply chains: A review. Transportation Research Part E: Logistics and Transportation Review, 99, 14-33. [55] Guoping, L.,Yun, H., Aizhi, W. (2017). Fourth industrial revolution: Technological drivers, impacts and coping methods. Published in www.Springer.com. 27(4), 626-637. [56] Haddara, M. (2014). ERP selection: The smart way. Procedia Technology .16, 394-403. [57] Han, D., Han, I. (2004). Prioritization and selection of intellectual capital measurement indicators using analytic hierarchy process for the mobile telecommunications industry. Expert Systems with Applications. 26, 519-527. [58] Haas, C. T., Rodriguez, A. M., Glover, R., Goodrum, P. M. (2001). Implementing a multiskilled workforce. Construction Management & Economics, 19(6), 633-641. [59] Harbi, K.M. (2001). Application of the AHP in project management, International Journal of Project Management, 19, 19-27. [60] Hasan, M. A., Shankar, R., & Sarkis, J. (2008). Supplier selection in an agile manufacturing environment using data envelopment analysis and analytical network process. International Journal of Logistics Systems and Management, 4(5), 523-550. [61] Hecklau F., Galeitzkea M., Flachsa S., Kohlb H. (2016). Holistic approach for human resource management in industry 4.0. Procedia CIRP, 54, 1-6. [62] Hermann, M., Pentek, T., Otto, B. (2016). Design principles for industry 4.0 scenarios. 49th Hawaii International Conference on System Sciences (HICSS), 3928- 3937. Retrieved March 2018 from https://ieeexplore.ieee.org/document/7427673/. [63] Hopp, WJ., Van, MP. (2004). Agile workforce evaluation: A framework for cross-training and coordination. IIE Transaction, 36,919. 82 [64] Hyari, K., El-Mashaleh, M., Kandil, A. (2010). Optimal assignment of multiskilled labor in building construction projects. International Journal of construction education and research. 6(1), 70-80. [65] Hyldegard, J. (2006). Collaborative information behaviour exploring Kuhlthau’s information search process model in a group-based educational setting. Information Processing and Management, 42,276–298. [66] Joshi, A., Jackson, S.E. (2003). Managing workforce diversity to enhance cooperation in organizations. International Handbook of Organizational Teamwork and Cooperative Working, 277–296. Retrieved April 2018 from https://onlinelibrary.wiley.com/doi/pdf/10.1002/9780470696712.ch14. [67] Ji, P., Zhang, H. Y., & Wang, J. Q. (2018). A projection-based TODIM method under multi-valued neuromorphic environments and its application in personnel selection. Neural Computing and Applications, 29(1), 221-234. [68] Jun (2010). Multi-objective optimization for resource driven scheduling in construction projects. University of Illinois at Urbana-Champaign. Retrieved April 2018 from https://core.ac.uk/download/pdf/4825454.pdf. [69] Kabak, M. (2013). A Fuzzy DEMATEL-ANP Based Multi Criteria Decision Making Approach For Personnel Selection. Journal of Multiple-Valued Logic & Soft Computing, 20(5), 571-593. [70] Karre H., Hammera M., Kleindiensta M., Ramsauera, C. (2017). Transition towards an Industry 4.0 state of the Lean Lab at Graz University of Technology.7th Conference on Learning Factories, 9,206-213. [71] Karsak, E. E. (2001). Personnel selection using a fuzzy MCDM approach based on ideal and anti-ideal solutions. In Multiple criteria decision making in the new millennium ,393-402. Retrieved November 2018 from https://link.springer.com/chapter/10.1007/978-3-642-56680-6_36. [72] Ketabchi, S., Moosaei, H., Fallahi, S. (2013). Optimal error correction of the absolute value equation using a genetic algorithm. Mathematical and Computer Modelling, 57, 2339-2342. [73] Khan M., Salah K. (2018). IoT security: Review, block chain solutions, and open challenges. Future Generation Computer Systems, 82,395-411. [74] Killic, H.S., Zaim, S., Delen, D. (2015). Selecting “The Best” ERP system for SMEs using a combination of ANP and PROMETHEE methods. Expert Systems with applications.42(5), 2343-2352. [75] Kim, H., Hwang, Y., Kim, K. (2014). Study on the application of multi-skilled labors to factory production process for securing economic feasibility of modular unit. Korean Journal of Construction Engineering and Management, 15(1), 11-19. [76] Kinzel, H. Industry 4.0- Where does this leave the human factor. Retrieved October 2017 from https://tci-thaijo.org/index.php/JUCR/article/view/108399/85751. [77] Konak, A., Coit, D.W., Smith, A.E. (2006). Multi-objective optimization using genetic algorithms: A tutorial. Reliability Engineering & System Safety, 91,992-1007. [78] Koutra, G., Barbounaki, S., Kardaras, D., & Stalidis, G. (2017, July). A multicriteria model for personnel selection in maritime industry in Greece. In Business Informatics (CBI), 2017 IEEE 19th Conference, Vol. 1, pp. 287-294. [79] Kundakcı, N. (2016). Personnel selection with grey relational analysis. Management Science Letters, 6(5), 351-360. [80] Kusumawardani, R.P., Agintiara, M. (2015). Application of Fuzzy AHPTOPSIS Method for Decision Making in Human Resource Manager Selection Process. Procedia Computer Science, 72,638-646. 83 [81] Lee, J.W., Kim, S.H. (2001). An integrated approach for interdependent information system project selection. International Journal of Project Management. 19(2), 111-118. [82] Leyh, C., Schaffer, T., Bley, K., Forstenhausler, S. (2016). SIMMI 4.0- A maturity model for classifying the enterprise-wide IT and software landscape focussing on industry 4.0. Federated Conference on Computer Science and Information Systems (FedCSIS), 8, 1297-1302. [83] Liao, C.N., Kao, H.P. (2011). An integrated fuzzy TOPSIS and MCGP approach to supplier selection in supply chain management. Expert Systems with Applications. 38(9). 10803-10811. [84] Liao, Y., Deschamps, F., Loures, E. D. F. R., & Ramos, L. F. P. (2017). Past, present and future of Industry 4.0-a systematic literature review and research agenda proposal. International journal of production research, 55(12), 3609-3629. [85] Lill, I. (2009). Multiskilling in construction‐a strategy for stable employment. Technological and Economic Development of Economy, 15(4), 540-560. [86] LimaJunior, F.R., Osiro, L., Carpinetti, L.C.R. (2014). A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Journal of Applied Soft Computing, 21, 194-209. [87] Lin, C.M., Gen, M. (2008). Multi-criteria human resource allocation for solving multistage combinatorial optimization problems using multi-objective hybrid genetic algorithm. International Journal of Expert Systems with Applications, 34, 2480-2490. [88] Lin, C.H. (2013). A rough penalty genetic algorithm for constrained optimization. Journal of Information Sciences, 241, 119-137. [89] Liu, C., Xu, X. (2017). Cyber-physical machine tool- the era of machine tool 4.0. The 50th CIRP conference on manufacturing system, 63, 70-75. [90] Lin, H. T. (2010). Personnel selection using analytic network process and fuzzy data envelopment analysis approaches. Computers & Industrial Engineering, 59(4), 937-944. [91] Longo, F., Nicoletti, L., Padovano, A. (2017). Smart operators in industry 4.0: A human-centred approach to enhance operators’ capabilities and competencies within the new smart factory context. Computers and Industrial Engineering. 113,144-159. [92] Lorenz, M., Gerbert, P., Rubmann, M. (2015). Industry 4.0: the future of productivity and growth in manufacturing industries. Retrieved January 2018 from https://www.bcg.com/enca/ publications/2015/engineered_products_project_business_industry_4_future_produ ctivity_growth_manufacturing_industries.aspx. [93] Luque, G.,Alba, E. (2005). Workforce Planning with a Parallel Genetic Algorithm. Studies in Computational Intelligence, 367, 115-134. [94] Masdefiol, R., del Mar, M., & Stävmo, F. (2016). Industry 4.0–Only designed to fit the German automotive industry: A multiple case study on the feasibility of Industry 4.0 to Swedish SMEs. Retrieved February 2018 from http://hj.divaportal. org/smash/record.jsf?aq2=%5B%5B%5D%5D&c=186&af=%5B%5D&search Type=SIMPLE&query=&language=sv&pid=diva2%3A933316&aq=%5B%5B%7B %22organisationId%22%3A%22139%22%7D%5D%5D&sf=all&aqe=%5B%5D&so rtOrder=author_sort_asc&onlyFullText=false&noOfRows=50&dswid=689. [95] Masoni, R., Ferrise, F., Bordegoni, M., Gattullo, M., Uva A.E., Fiorentino, M., Carrabba, E., Donato, M.D. (2017). Supporting remote maintenance in industry 4.0 through augmented reality. 27th International Conference on Flexible Automation and Intelligent Manufacturing, FAIM201, 11, 1296-1302. 84 [96] Maturana, S., Alarcón, L. F., Deprez, M. (2003). Modelling the impact of multiskilling and concrete batch size in multi-storey buildings. In Proceedings of the XI Conference on Lean Construction, IGLC, 11,553-566. [97] McCall, J. (2004). Genetic algorithms and modelling. Journal of Computational and Applied Mathematics, 184,205-222. [98] Meade, L.M., Presley, A. (2002). R & D project selection using the analytic network process. IEEE Transactions on Engineering Management, 49(1), 59-66. [99] Mitchell, M. (1996). An Introduction to Genetic Algorithms. MIT Press Cambridge,205. Retrieved February 2018 from https://mitpress.mit.edu/books/introduction-genetic-algorithms. [100] Motyl B., Baronio G., Uberti S., Speranza D. (2017). How will change the future engineer’s skills in the industry 4.0 framework? A questionnaire surveys. Procedia Manufacturing, 11, 1501-1509. [101] Naveh, Y, Richter, Y, Altshuler, Y, Gresh, DL, Connors, DP. (2007) Workforce optimization: Identification and assignment of professional workers using constraint programming. IBM Journal of Research and Development, 51,263–279. [102] Nie, H., Liu. B. (2013). Combining MILP with Memetic Algorithm for Scheduling and Staffing Construction Project with a Multi-skilled Workforce. International Conference on Computational and Information Sciences (ICCIS), 1150- 1153. Retrieved October 2018 from https://ieeexplore.ieee.org/document/6643222/. [103] Nowotarski, P., & Paslawski, J. (2017, October). Industry 4.0 concept introduction into construction SMEs. In IOP Conference Series: Materials Science and Engineering, 245(5). Retrieved December 2018 from http://iopscience.iop.org/article/10.1088/1757-899X/245/5/052043. [104] Nurcin, C., Xi, H., Xu, D., Son Y.J., Lemaire, R., Provan, K. (2011). Simulation-based workforce assignment considering position in a social network, Simulation, 88(1), 72 – 96. Retrieved February 2018 from https://dl.acm.org/citation.cfm?id=2433909. [105] Hester, P.T., Velasquez, M. (2013). An analysis of multi-criteria decisionmaking methods. International Journal of Operations Research. 10(2). 56-66. [106] Pereshybkina, A., Conde, M. E. C., & Kalyesubula, T. (2017). How will the industry 4.0 transformations affect SMEs in Germany by 2030? Retrieved January 2018 from https://opus.hsfurtwangen.de/.../Project+A_Scenario+Industry+4.0+and+SMEs_EK2. [107] Pitic, L., Popescu, S., Pitic, D. (2014). Roadmap for ERP evaluation and selection. Procedia Economics and Finance. 15, 1374-1382. [108] Radziwon, A., Bilberg, A., Bogersa, M., Madsen, E.S. (2014). The Smart Factory: Exploring Adaptive and Flexible Manufacturing. Procedia Engineering, 69, 1184-1190. [109] Reid, D.J. (1996). Genetic Algorithms in Constrained Optimization. Journal of Mathematical and Computer Modelling, 23, 87-111. [110] Roblek, V., Meško, M., & Krapež, A. (2016). A complex view of industry 4.0. Sage Open, 6(2). Retrieved January 2018 from http://journals.sagepub.com/doi/abs/10.1177/2158244016653987. [111] Ross, E. (2017). Cross-trained workforce planning models (Doctoral dissertation, Lancaster University). Retrieved June 2018 from http://www.research.lancs.ac.uk/portal/en/publications/crosstrained-workforceplanning- models(bcb8d06c-be3f-4517-81e8-699953bd62a0).html. [112] Russoa, F.S.M., Camanho, R. (2015). Criteria in AHP: A Systematic Review of Literature, Procedia Computer Science, 55, 1123-1132. 85 [113] Saaty, T.L., Peniwati, K., Shang, J.S. (2007). The analytic hierarchy process and human resource allocation: Half the story. Journal of Mathematical and Computer Modelling, 46, 1041-1053. [114] Sadeghzadeh K., Salehi M. (2011). Mathematical analysis of fuel cell strategic technologies development solutions in the automotive industry by the TOPSIS multicriteria decision-making method. International journal of Hydrogen Energy, 36(20), 13272-13280. [115] Samaranyake, P., Ramanathan, K., Laosirihongthong, T. (2017). Implementing Industry 4.0 - A Technological Readiness Perspective. International conference on Industrial Engineering and Engineering Management (IEEM),529-533. Retrieved October 2017 from https://ieeexplore.ieee.org/document/8289947/. [116] Sampson, SE. (2006). Optimization of volunteer labor assignments. Journal of Operations Management, 24, 363–377. [117] Santos, M. Y., e Sá, J. O., Andrade, C., Lima, F. V., Costa, E., Costa, C., ... & Galvão, J. (2017). A Big Data system supporting Bosch Braga Industry 4.0 strategy. International Journal of Information Management, 37(6), 750-760. [118] Sari, B., Sen, T., & Kilic, S. E. (2008). Ahp model for the selection of partner companies in virtual enterprises. The International Journal of Advanced Manufacturing Technology, 38(3-4), 367-376. [119] Sarkis, J., Talluri, S., & Gunasekaran, A. (2007). A strategic model for agile virtual enterprise partner selection. International Journal of Operations & Production Management, 27(11), 1213-1234. [120] Sepehr, A., Zucca, C. (2012). Ranking desertification indicators using TOPSIS Algorithm. Natural Hazards: Journal of International Society for the Prevention and Mitigation of Natural Hazards, 62, 1137-1153. [121] Schumacher A., Erol S., Sihn W. (2016). A maturity model for assessing industry 4.0 readiness and maturity of manufacturing enterprises. Procedia CIRP, 52,161-166. [122] Sha, D. Y., & Che, Z. H. (2005). Virtual integration with a multi-criteria partner selection model for the multi-echelon manufacturing system. The International Journal of Advanced Manufacturing Technology, 25(7-8), 793-802. [123] Shahin A., Mahbod M. (2007). Prioritization of key performance indicators. International Journal of Productivity and Performance Management. 56(3), 226-240. [124] Shih H-S, Shyur H-J, Stanley Lee E.(2007), An extension of TOPSIS for group decision making, Mathematical and Computer Modelling, 45, 801–813. [125] Simons, S., Abe, P., Neser, S. (2017). Learning in the AutFab- the fully automated industrie 4.0 learning factory of the University of Applied Science Darmstadt. 7th conference on learning factories, 9, 81-88. [126] Sniderman, B., Mahto, M., Cotteleer, M. (2016). Industry 4.0 and manufacturing ecosystems. Exploring the world of connected enterprises. Retrieved September 2017 from https://www2.deloitte.com/insights/us/en/focus/industry-4- 0/manufacturing-ecosystems-exploring-world-connected-enterprises.html. [127] Sureeyatanapas, P., Sriwattananusart, K., Niyamosoth, T., Sessomboon, W., Arunyanart, S. (2018). Supplier selection towards uncertain and unavailable information: An extension of TOPSIS method. Journal Operations Research Perspectives, 5, 69-79. [128] Su, X., Hu, Y., Huang, S., Mahadevan, S., Deng, Y. (2014). A new decisionmaking method by incomplete preferences based on evidence distance. Knowledge- Based System, 56,264-272. 86 [129] Subramanian, P., Ramanathan, K., Laosirihongthong, T. (2012). A review of applications of Analytic Hierarchy Process in operations management. International Journal of Production Economics, 138, 215-241. [130] Sundar, D., Umadevi, B., Alagarsamy, K. (2010). Multi Objective Genetic Algorithm for the Optimized Resource Usage and the Prioritization of the Constraints in the Software Project Planning. International journal of Computer Applications, 3, 1- 4. [131] Sung, T.K. (2018). Industry 4.0: A Korea perspective. Journal of Technological Forecasting and Social Change, 132, 40-45. [132] Thannimalai, P., Kadhum, M.M., Feng, C.J., Ramadass, S. (2013). A glimpse of cross training models and workforce scheduling optimization. 2013 IEEE Symposium on Computers & Informatics, 98-103. Retrieved May 2018 from https://ieeexplore.ieee.org/abstract/document/6612383/. [133] Tsai, C.W., Lai, C.F., Chiang, M.C., Yang, L.T. (2013). Data mining for internet of things: a survey. IEEE Communications Surveys & Tutorials. 16(1), 77-97. [134] Vaidya, O.S., Kumar, S. (2006). Analytic hierarchy process: An overview of applications. European Journal of Operational Research, 169, 1-29. [135] Vafaeipour, M., Zolfani, S.H., Varzandeh, M.H.M., Derakhti, A., Eshkalag, M.K. (2014). Assessment of regions priority for implementation of solar projects in Iran: New application of a hybrid multi-criteria decision-making approach. Journal of Energy Conversion and Management, 86, 653-663. [136] Verdecho, M. J., Alfaro-Saiz, J. J., Rodriguez-Rodriguez, R., & Ortiz-Bas, A. (2012). A multi-criteria approach for managing inter-enterprise collaborative relationships. Omega, 40(3), 249-263. [137] Vidic, N.S. (2008). Developing methods to solve the workforce assignment problem considering worker heterogeneity and learning and forgetting, PhD Dissertation, University of Pittsburgh. Retrieved May 2018 from https://www.researchgate.net/publication/282259842_developing_methods_to_solve_ the_workforce_assignment .problem_considering_worker_heterogeneity_and_learning_and_forgettingdeveloping _methods_to_solve_the_workforce_assignment_problem_considering_worker . [138] Wan, J., Cai, H., Zhou, K. (2015). Industrie 4.0: Enabling Technologies. International conference on intelligent computing and internet of things(ICIT). Retrieved March 2018 from https://ieeexplore.ieee.org/document/7111555/. [139] Walter, M., Zimmermann, J. (2016). Minimizing average project team size given multi-skilled workers with heterogeneous skill levels. Computers & Operations Research, 70, 163-179. [140] Wei, C.C., Chien, C.F., Wang, M.J.J. (2005). An AHP-based approach to ERP system selection. International Journal of Production Economics. 96(1), 47-62. [141] Wittenberg, C. (2016). Human-CPS interaction-requirements and humanmachine interaction methods for the industry 4.0. IFAC, 49, 420-425. [142] Wright, J., Alajmi, A. (2016). Efficient Genetic Algorithm sets for optimizing constrained building design problem. International Journal of Sustainable Built Environment, 5, 123-131. [143] Wong C., Sancha C., Thomson, C. (2017). A national culture perspective in the efficacy of supply chain integration practices. International Journal of production economics, 193,554-565. [144] Wongwai, N., Malaikrisanachalee, S. (2011). Augmented heuristic algorithm for multi-skilled resource scheduling. Automation in Construction, 20, 429–445. 87 [145] Wu, C., & Barnes, D. (2011). A literature review of decision-making models and approaches for partner selection in agile supply chains. Journal of Purchasing and Supply Management, 17(4), 256-274. [146] Wu, C., & Barnes, D. (2012). A dynamic feedback model for partner selection in agile supply chains. International Journal of Operations & Production Management, 32(1), 79-103. [147] Wu, C., Barnes, D., Rosenberg, D., & Luo, X. (2009). An analytic network process-mixed integer multi-objective programming model for partner selection in agile supply chains. Production Planning and Control, 20(3), 254-275. [148] Wu, C., & Barnes, D. (2010). Formulating partner selection criteria for agile supply chains: A Dempster–Shafer belief acceptability optimization approach. International Journal of Production Economics, 125(2), 284-293. [149] Xu X., Zhong R., Klotz E., Newman S., Thames L., Schaefer D. (2017). Intelligent manufacturing in the context of industry 4.0: A review. Software -defined cloud manufacturing for industry 4.0, 3(5), 616-630. [150] Yan, H., Chai, H. (2017). Evaluation of influencing factors on general aviation tourism industry of xi’an based on AHP and fuzzy comprehensive evaluation method. IEEE International Conference on Industrial Engineering and Engineering Management. Retrieved from https://ieeexplore.ieee.org/document/8290198/. [151] Zhang, S. F., & Liu, S. Y. (2011). A GRA-based intuitionistic fuzzy multicriteria group decision making method for personnel selection. Expert Systems with Applications, 38(9), 11401-11405. [152] Zhang, M., Guo, H., Huo, B., Zhao, X., Huang, J. (2017). Linking supply chain quality integration with mass customization and product modularity. International Journal of production economics. Retrieved June 2018 from https://www.sciencedirect.com/science/article/pii/S0925527317300117. [153] Zhang, Y. (2010). Research on human resource optimization based on genetic algorithm from perspective of two-way choice model. International Conference on Educational and Information Technology. Retrieved February 2018 from https://ieeexplore.ieee.org/document/5607688/. [154] Zhiting, S., Yanming, S., Jiafu, W., Peipei, L. (2017). Data quality management for service-oriented manufacturing cyber-physical systems. Computer and Electrical Engineering, 64, 34-44.