Atmaca, T. (1994). Approximate analysis of a conveyor system. The International Journal of Production Research, 32(11), 2645-2655. Babiceanu, R. F., & Chen, F. F. (2009). Distributed and centralized material handling scheduling: Comparison and results of a simulation study. Robotics and Computer-Integrated Manufacturing, 25(2), 441-448. Bartholdi III, J. J., Eisenstein, D. D., & Foley, R. D. (2001). Performance of bucket brigades when work is stochastic. Operations Research, 49(5), 710-719. Bastani, A. S. (1988). Analytical solution of closed-loop conveyor systems with discrete and deterministic material flow. European Journal of Operational Research, 35(2), 187-192. Bastani, A. S. (1990). Closed-loop conveyor systems with breakdown and repair of unloading stations. IIE Transactions, 22(4), 351-360. Bastani, A. S., & Elsayed, E. A. (1986). Blocking in closed-loop conveyor systems connected in series with discrete and deterministic material flow. Computers & Industrial Engineering, 11(1-4), 40-45. Bozer, Y. A., & Hsieh, Y. J. (2004). Expected waiting times at loading stations in discrete-space closed-loop conveyors. European Journal of Operational Research, 155(2), 516-532. Bozer, Y. A., & Hsieh, Y. J. (2005). Throughput performance analysis and machine layout for discrete-space closed-loop conveyors. IIE Transactions, 37(1), 77-89. Bozer, Y. A., & White, J. A. (1990). Design and performance models for end-of-aisle order picking systems. Management Science, 36(7), 852-866. Chew, E. P., & Tang, L. C. (1999). Travel time analysis for general item location assignment in a rectangular warehouse. European Journal of Operational Research, 112(3), 582-597. Coffman Jr, E. G., Gelenbe, E., & Gilbert, E. N. (1988). Analysis of a conveyor queue in a flexible manufacturing system. European Journal of Operational Research, 35(3), 382-392. de Koster, R. (1994). Performance approximation of pick-to-belt orderpicking systems. European Journal of Operational Research, 72(3), 558-573. Disney, R. L. (1962). Some multichannel queueing problems with ordered entry. Journal of Industrial Engineering, 13(1), 46-48. Drießel, R., & Mönch, L. (2012). An integrated scheduling and material-handling approach for complex job shops: a computational study. International Journal of Production Research, 50(20), 5966-5985. Gong, Y., & De Koster, R. B. (2011). A review on stochastic models and analysis of warehouse operations. Logistics Research, 3(4), 191-205. Huang, S. H., Dismukes, J. P., Shi, J., Su, Q. I., Razzak, M. A., Bodhale, R., & Robinson, D. E. (2003). Manufacturing productivity improvement using effectiveness metrics and simulation analysis. International Journal of Production Research, 41(3), 513-527. Hur, S., & Nam, J. (2006). Performance analysis of automatic storage/retrieval systems by stochastic modelling. International Journal of Production Research, 44(8), 1613-1626. Jackson, J. R. (1957). Networks of waiting lines. Operations Research, 5(4), 518-521. Karasawa, Y., Nakayama, H., & Dohi, S. (1980). Trade-off analysis for optimal design of automated warehouses. International Journal of Systems Science, 11(5), 567-576. Korporaal, R., Ridder, A., Kloprogge, P., & Dekker, R. (2000). An analytic model for capacity planning of prisons in the Netherlands. Journal of the Operational Research Society, 51(11), 1228-1237. Kou, X., Xu, G., & Yi, C. (2018). Belt-conveyor based efficient parallel storage system design and travel time model analysis. International Journal of Production Research, 56(23), 7142-7159. Kwo, T. (1958). A theory of conveyors. Management Science, 5(1), 51-71. Lineshaft Roller Conveyor Merges. (n.d.). Automation Supplies Ltd. Retrieved January 24, 2021, from http://www.automation-supplies.com/Roller-Conveyors-Lineshaft-Merge.html Muth, E. J. (1977). A model of a closed-loop conveyor with random material flow. AIIE Transactions, 9(4), 345-351. Osorio, C., & Bierlaire, M. (2009). An analytic finite capacity queueing network model capturing the propagation of congestion and blocking. European Journal of Operational Research, 196(3), 996-1007. Petersen II, C. G. (2000). An evaluation of order picking policies for mail order companies. Production and Operations Management, 9(4), 319-335. Pick Module Racking. (2019, September 11). ARPAC. Retrieved January 24, 2021, from https://www.arpac.ca/product/pick-module-racking Ratliff, H. D., & Rosenthal, A. S. (1983). Order-picking in a rectangular warehouse: a solvable case of the traveling salesman problem. Operations Research, 31(3), 507-521. Schmenner, R. W. (2015). The pursuit of productivity. Production and Operations Management, 24(2), 341-350. Schmidt, L. C., & Jackman, J. (2000). Modeling recirculating conveyors with blocking. European Journal of Operational Research, 124(2), 422-436. Simulation Software | Simcad Pro. (n.d.). CreateASoft. Retrieved February 2, 2021, from https://www.createasoft.com/ Sonderman, D. (1982). An analytical model for recirculating conveyors with stochastic inputs and outputs. The International Journal of Production Research, 20(5), 591-605. Sormaz, D., Romero-Montoya, A., Williams, B., Weiser, J., & Rodriguez, E. (2017). Simulation of Distribution Centers using Simio–Case Study. In IIE Annual Conference. Proceedings (pp. 1950-1955). Institute of Industrial and Systems Engineers (IISE). Van den Berg, J. P., Sharp, G. P., Gademann, A. N., & Pochet, Y. (1998). Forward-reserve allocation in a warehouse with unit-load replenishments. European journal of operational research, 111(1), 98-113. van der Gaast, J. P., de Koster, M. B. M., & Adan, I. J. (2018). Conveyor merges in zone picking systems: a tractable and accurate approximate model. Transportation Science, 52(6), 1428-1443. Van Nieuwenhuyse, I., & de Koster, R. B. (2009). Evaluating order throughput time in 2-block warehouses with time window batching. International Journal of Production Economics, 121(2), 654-664. What is a conveyor belt? (2020, March 17). L.A.C. Conveyors & Automation. Retrieved January 24, 2021, from https://www.lacconveyors.co.uk/what-is-a-conveyor-belt/ Xue, J., & Proth, J. M. (1987). Study of a closed loop conveyor system. INFOR: Information Systems and Operational Research, 25(1), 84-92. Yan, B., & Lee, D. (2009). AS/RS simulation and optimization based on Flexsim. In 2009 International Workshop on Intelligent Systems and Applications (pp. 1-4). IEEE. Zijm, W. H., Adan, I. J., Buitenhek, R., & van Houtum, G. J. (2000). Capacity analysis of an automated kit transportation system. Annals of Operations Research, 93(1-4), 423-446.