Login | Register

Selection of P3 delivery methods for Sustainable Social Infrastructure Projects Using the Analytical Hierarchical Process

Title:

Selection of P3 delivery methods for Sustainable Social Infrastructure Projects Using the Analytical Hierarchical Process

Semgalawe, Nita (2024) Selection of P3 delivery methods for Sustainable Social Infrastructure Projects Using the Analytical Hierarchical Process. Masters thesis, Concordia University.

[thumbnail of Semgalawe_MASc_S2024.pdf]
Preview
Text (application/pdf)
Semgalawe_MASc_S2024.pdf - Accepted Version
Available under License Spectrum Terms of Access.
4MB

Abstract

This thesis studies the necessary shift in screening practices of public-private partnerships (P3) projects in Canada, moving beyond traditional qualitative criteria to include broader environmental, social, and governance (ESG) project objectives. The current P3 screening, while effective, needs adaptation to align with Canadian societal and environmental infrastructure goals. In response, this thesis focuses on three objectives aimed at improving social infrastructure P3 procurement and promoting sustainable and responsible project management practices for these projects. Firstly, it identifies and describes Canadian-specific ESG criteria important for ensuring responsible sustainability in delivering social infrastructure projects. Secondly, it develops an ESG-PPP screening matrix to evaluate social infrastructure projects based on responsible sustainability thresholds, determining their suitability for P3 procurement. Thirdly, it implements a multi-criteria analysis using the Analytic Hierarchy Process (AHP) to determine the most appropriate P3 model for social infrastructure projects, considering the identified ESG criteria and quantitative value-for-money criterion. The AHP-PPP selection tool is applied to three case studies analyzing two AHP scales to assess their consistency ratios and the reliability of the P3 selection results. The results indicate that the balanced-n scale exhibit lower inconsistency ratios compared to the fundamental AHP scale, and decisions on P3 options remained consistent across all case studies using both scales, suggesting that the Fundamental AHP scale remains reliable if decision-makers accurately reflect the relative importance of P3 options. Overall, this thesis addresses the increasing need for sustainable and responsible management of social infrastructure projects in Canada by integrating ESG factors into the current procurement process.

Divisions:Concordia University > Gina Cody School of Engineering and Computer Science > Building, Civil and Environmental Engineering
Item Type:Thesis (Masters)
Authors:Semgalawe, Nita
Institution:Concordia University
Degree Name:M.A. Sc.
Program:Building Engineering
Date:1 April 2024
Thesis Supervisor(s):Moselhi, Osama
Keywords:Procurement of Public-private partnerships (P3), Environmental, social, and governance (ESG), Social infrastructure projects, and Analytical Hierarchy Structure (AHP)
ID Code:993786
Deposited By: Nita Semgalawe
Deposited On:04 Jun 2024 14:36
Last Modified:04 Jun 2024 14:36

References:

[1]
Government Canada , "Investing in Canada - Building a better Canada," 15 December 2023. [Online]. Available: https://www.infrastructure.gc.ca/plan/about-invest-apropos-eng.html. [Accessed 2 June 2022].
[2]
Government of Canada , "Investing in Canada Infrastructure Program," 20 December 2023. [Online]. Available: https://www.infrastructure.gc.ca/plan/icp-pic-INFC-eng.html. [Accessed 2 June 2022].
[3]
Infrastructure Canada, "Building pathways to 2050: Moving forward on the National Infrastructure Assessment," 2021. [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.infrastructure.gc.ca/alt-format/pdf/nia-eni/nia-eni-2-en1.pdf. [Accessed 03 06 2022].
[4]
Government of Canada, "Towards Canada's 2030 Agenda National Strategy," 15 June 2019. [Online]. Available: https://www.canada.ca/en/employment-social-development/programs/agenda-2030/national-strategy.html. [Accessed 7 June 2021].
[5]
G. H. Brundtland, "Report of the World Commission on Environment and Development: Our Common Future," 20 March 1987. [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://sustainabledevelopment.un.org/content/documents/5987our-common-future.pdf. [Accessed 8 June 2022].
[6]
Cassa Depositi e Prestiti, "Social Infrastructure: Sectoral Strategic Guideline," [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.cdp.it/resources/cms/documents/CDP_SOCIAL_INFRASTRUCTURE_ENG.pdf. [Accessed 1 July 2022].
[7]
A. W. Connors, An exploratory study of the use of Social Infrastructure Public-Private Partnership (P3s) for Public University Facilities, Florida: University of Central Florida , 2021.
[8]
Government of Canada , "Investing in Canada Plan funding stream: Social infrastructure," 2024. [Online]. Available: https://www.infrastructure.gc.ca/plan/si-is-eng.html. [Accessed 16 April 2024].
[9]
SP3CTRUM, "SP3CTRUM," 2024. [Online]. Available: http://www.p3spectrum.ca/project/. [Accessed 2 May 2022].
[10]
Canadian Council of Public Private Partnerships , "Types of P3s," [Online]. Available: https://www.pppcouncil.ca/why-p3s/types-of-p3s. [Accessed 1 October 2023].
[11]
Canadian Council for Public-Private Partnerships, "The Evolution of Canada's Model: P3 Policy Discussion paper," October 2023. [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.pppcouncil.ca/getmedia/42b4a5fb-84df-4d76-8494-129dc1baa028/P3-Policy-Discussion-Paper_October2023.pdf. [Accessed 2023].
[12]
D. Baxter, "PPP Evaluation Criteria: Procurement's Achilles Heel?," 8 September 2022. [Online]. Available: https://www.linkedin.com/pulse/ppp-evaluation-criteria-procurements-achilles-heel-david-baxter/. [Accessed 15 December 2023].
[13]
S. Hussain and J. McKellar, "Exploring the Success of Social Infrastructure Public Private Partnerships: The Complex Case of Bridgepoint Active Healthcare in Ontario, Canada," Public Works Management & Policy, vol. 25, no. 3, pp. 259-280, 2020.
[14]
K. A. A. A. S. A. H. Mounir El Khatib, "Sustainable Project Management: Trends and Alignment," Theoretical Economics Letters, vol. 10, no. 6, p. 16, 2020.
[15]
Buy social canada, 2018. [Online]. Available: https://www.buysocialcanada.com/wp-content/uploads/BSC_socialprocurement_R5_EN_SCREEN.pdf.. [Accessed 6 August 2023].
[16]
CBC News, 2 men charged with fraud after probe into $300M St. Michael's Hospital redevelopment, Toronto: CBC, 2023.
[17]
The Canadian Council For Public-Private Partnerships, "Building North America's first fully digital Hospital," The Canadian Council For Public-Private Partnerships, Ontario, 2015.
[18]
The Council of canadians , "Public-private partnerships have no place in canada's post- covid just recovery," 12 November 2020. [Online]. Available: https://canadians.org/analysis/public-private-partnerships-have-no-place-canadas-post-covid-just-recovery/. [Accessed 2023 December 15].
[19]
Prevalent , "Navigating ESG and Third-Party Risk Management," Prevalent , 2023.
[20]
O. L. B. A. O. T. N. O. J. L. Ali Hosseini, "Selection Criteria for Delivery Methods for Infrastructure Projects," Procedia - Social and Behavioral Sciences, vol. 226, pp. 260-268, 2016.
[21]
Canadian Housing and Renewal Association , "What is Community Housing?," [Online]. Available: https://chra-achru.ca/what-is-community-housing/#:~:text=Community%20housing%3A%20Also%20known%20as,part%20by%20provincial%20rent%20supplements.. [Accessed 8 February 2024].
[22]
Canada Mortage and Housing Corporation , "Canada’s Housing Supply Shortage: Restoring affordability by 2030," 23 June 2022. [Online]. Available: https://www.cmhc-schl.gc.ca/blog/2022/canadas-housing-supply-shortage-restoring-affordability-2030. [Accessed 2023 November 20].
[23]
Government of Alberta, "Fiscal plan: A Responsible Plan for a Growing Province," Government of Alberta, Alberta, 2024-2027.
[24]
Government of Ontraio, "More Homes Built faster," 25 October 2022. [Online]. Available: https://www.ontario.ca/page/more-homes-built-faster#:~:text=Our%20government%20has%20committed%20to,next%20step%20to%20getting%20there.. [Accessed 8 February 2023].
[25]
Infrastructure Ontario, "Transit-Oriented Communities (Subways)," 2021. [Online]. Available: https://www.infrastructureontario.ca/en/what-we-do/development/transit-oriented-communities-subways/. [Accessed 20 December 2023].
[26]
Government of British Columbia: Stronger BC for everyone, "Homes for People: An action plan to meet the challenges of today and deliver more homes for people, faster," 2023. [Online]. Available: https://news.gov.bc.ca/files/Homes_For_People.pdf.. [Accessed 20 January 2024].
[27]
Saskatchewan Housing Corporation, "The Saskatchewan Housing Action Plan 2022-2023," Saskatchewan Housing Corporation , Saskatchewan , 2022-2023.
[28]
J. Chava and P. Newman, "Stakeholder Deliberation on Developing Affordable Housing Strategies: Towards Inclusive and Sustainable Transit-Oriented Developments," Sustainability, vol. 8, no. 10, p. 1024, 2016.
[29]
J. Grant, "10 reasons affordable housing is hard to deliver," 31 August 2023. [Online]. Available: https://www.halifaxexaminer.ca/commentary/10-reasons-affordable-housing-is-hard-to-deliver/. [Accessed 11 December 2023].
[30]
Ministere de l'Education, "The Educational Project Guide," Ministere de l'Education, Quebec, 2022.
[31]
Alberta , "Planning and building schools:Learn how Alberta school projects are planned and find projects approved for construction," [Online]. Available: https://www.alberta.ca/planning-and-building-schools. [Accessed 5 January 2024 ].
[32]
Government of Alberta: Alberta Education , "School Capital Manual for the 2022/23 School Year," Government of Alberta , Alberta, 2022.
[33]
The Canadian Council For Public-Private Partnerships, "P3’s: Bridging the first nations infrastructure gap," The Canadian Council For Public-Private Partnerships, 2016.
[34]
ecoschools, "Our impact," ecoschools, [Online]. Available: https://ecoschools.ca/about/our-impact/. [Accessed 06 February 2024].
[35]
Sustainable Schools: Saving our energy for education , "2023 Top Energy Performing School Boards Report," Climate Challenge Network, Ontario, 2023.
[36]
Infrastructure Canada, "Environmental Impact Assessment," 3 February 2023. [Online]. Available: https://www.infrastructure.gc.ca/alt-format/pdf/assessment-enviro-eval-eng.pdf. [Accessed 5 January 2024].
[37]
First Nations Infrastructure Institute, "First Nations Infrastructure Institute: Closing the Gap," 2024. [Online]. Available: https://fnii.ca/. [Accessed 2024].
[38]
J. French, "Alberta no longer using P3 approach as preferred way to build schools," CBC News, 26 December 2022. [Online]. Available: https://www.cbc.ca/news/canada/edmonton/alberta-no-longer-using-p3-approach-as-preferred-way-to-build-schools-1.6697233. [Accessed 30 November 2023].
[39]
Canadian Institute , "Accelerating Innovative Approaches to Healthcare Facility Design and Delivery: Healthcare Infrastructure, Eastern Canada," 2024. [Online]. Available: https://www.canadianinstitute.com/canadian-healthcare-infrastructure/. [Accessed 20 January 2024].
[40]
J. D. S. J. M. Matthew J. Eckelman, "Life cycle environmental emissions and health damages from the Canadian healthcare system: An economic-environmental-epidemiological analysis," PLoS Med, vol. 15, no. 7, 2018.
[41]
G. R. a. C. Samuelson, "Deferred Hospital Maintenance in Canada: There is more to ‘a building’ than building it," HealthCareCAN, Ontario, 2016.
[42]
T. Roberts, "A depleted treasury making it difficult to keep up with health maintenance, says John Haggie," CBC News, 24 01 2018. [Online]. Available: https://www.cbc.ca/news/canada/newfoundland-labrador/health-maintenance-deferred-1.4501361. [Accessed 4 December 2023].
[43]
B. Burmahl and J. Morgan, "Maintenance staff plays key design and construction role: Real-life examples prove the value of maintenance staff involvement in health care construction projects," American Hospital Association: Health facilities management Magazine, 31 March 2022. [Online]. Available: https://www.hfmmagazine.com/articles/4424-maintenance-staff-plays-key-design-and-construction-role. [Accessed 6 December 2023].
[44]
S. T. Tamur and K. R. Erzaij, "The effectiveness of project delivery systems in the optimal implementation of green buildings," in IOP Conference Series: Materials Science and Engineering, Iraq, 2021.
[45]
"Investing in Canada Plan funding stream: Public transit infrastructure," Government of Canada, 26 9 2023. [Online]. Available: https://www.infrastructure.gc.ca/plan/pti-itc-eng.html. [Accessed 3 March 2023].
[46]
Federation of Canadian Municipalities, "Public Transit," [Online]. Available: https://fcm.ca/en/focus-areas/public-transit. [Accessed 9 November 2023].
[47]
Infrastructure Canada, "Permanent, Integrated, and Locally Responsive: New Foundations for Public Transit Funding in Canada," Infrastructure Canada, https://www.infrastructure.gc.ca/alt-format/pdf/transit-transport/pptf-report-rapport-fptc-en.pdf, 2023.
[48]
Canadian Urban Transit Association (CUTA), "CUTA calls for urgently needed transit funding in 2024 federal budget," 15 February 2024. [Online]. Available: https://cutaactu.ca/cuta-calls-for-urgently-needed-transit-funding-in-2024-federal-budget/#:~:text=Public%20transit%20systems%20collectively%20faced,ability%20to%20serve%20communities%20effectively.. [Accessed 2 March 2024].
[49]
A. M. Jones, "Canadians want transparency, region-specific solutions in government's plan to fund all public transit: report," CTV News, 25 July 2023. [Online]. Available: https://www.ctvnews.ca/canada/canadians-want-transparency-region-specific-solutions-in-government-s-plan-to-fund-all-public-transit-report-1.6494411. [Accessed 9 January 2024].
[50]
D. U. S. T. D. Carlos Dominguez Ordonez, "Green bonds in Public-Private Partnerships," International institute for Sustainable Development , Winnipeg, 2015.
[51]
Statistics Canada, "Canada's Core Public Infrastructure Survey: Culture,recreations and sports facilities, and public social and affordable housing, 2020," Statistics Canada, 2022.
[52]
Canadian Infrastructure Report Card (CIRC), "Monitoring the State of Canada’s Core Public Infrastructure," Canadian Infrastructure Report Card, Ottawa, 2019.
[53]
P. B. K. L. Kevin Quigley, "Cultural and Recreational Infrastructure in Nova Scotia: Future Investments and Governance," MacEachen and Dalhouse University, Nova Scotia, 2019.
[54]
F. A. J. N. G. G. P. Prita Amalia, "A systematic review of the interrelation of administrative, Environmental, Social and Governance of Public-Private Partnerships (PPP) Spaceport Project in Biak, Papua, Indonesia," Journal of Infrastructure, Policy and Development , vol. 7, no. 1, p. 1709, 2023.
[55]
J. L. Y. H. Caichuan Wang, "Construction of Performance Evaluation Model for the Operation and Maintenance of Government Enterprise Cooperation Infrastructure Projects under the ESG Concept," Social Security and Administration Management , vol. 4, no. 7, pp. 11-18, 2023.
[56]
Government of Canada, "Chapter 9: Special procurements," 23 November 2023. [Online]. Available: https://canadabuys.canada.ca/en/how-procurement-works/policies-and-guidelines/supply-manual/chapter-9#_9-60. [Accessed 20 July 2023].
[57]
PPP Canada, "A process guide for public sponsors," PPP Canada, Ontario, 2017.
[58]
"Competition Issues in Public-Private Partnerships," Organisation for Economic Co-operation and Development (OECD), 16 June 2014. [Online]. Available:https://www.oecd.org/competition/competitionissuesinpublic-privatepartnerships.htm. [Accessed 13 April 2024].
[59]
The Canada council for public private partnerships, "Types of P3s," 2022. [Online]. Available: https://www.pppcouncil.ca/why-p3s/types-of-p3s. [Accessed 9 June 2023].
[60]
King and Spalding, "Delivering Infrastructure Projects under a PPP Model: A guide to achieving success in Road, Rail,Airport,Port< Healthcare, Education, Housing and Accomodation PPP projects in the Middle East," King and Spalding, United Arab Emirates, 2017.
[61]
Infrastructure Ontario, "Infrastructure Ontario Projects: P3/ Major projects," 2024. [Online]. Available: https://www.infrastructureontario.ca/en/what-we-do/projectssearch/?cpage=1&facets=projecttype%3Ap3major. [Accessed 2024 January 8].
[62]
Infrastructure Alberta , "Public-private partnerships (P3s)," 2024. [Online]. Available: https://www.alberta.ca/public-private-partnerships#jumplinks-1. [Accessed 7 January 2024].
[63]
Canadian Council for Public private partnerships, "Better, Faster, Smarter: Building a school legacy for Saskatchewan," Canadian Council for Public private partnerships, 2015.
[64]
J. French, "Alberta no longer using P3 approach as preferred way to build schools," 26 December 2022. [Online]. Available: https://www.cbc.ca/news/canada/edmonton/alberta-no-longer-using-p3-approach-as-preferred-way-to-build-schools-1.6697233. [Accessed 23 February 2024].
[65]
A. Birrell, "Three times P3s screwed over Saskatchewan," 6 January 2020. [Online]. Available: https://saskdispatch.com/articles/view/public-private-partnerships-p3s-screwed-over-saskatchewan. [Accessed 24 February 2023].
[66]
Ministry of Transportation and Infrastructure, "Pattullo Bridge Replacement Project: Procurement Options Report," Partnerships British Columbia, British Columbia, 2018.
[67]
Canadian Council for Public-private Partnerships, "Why P3s?," 2024. [Online]. Available: https://www.pppcouncil.ca/why-p3s. [Accessed 2024].
[68]
PPP Canada , "P3 Business Case Development Guide," [Online]. Available: https://www.yumpu.com/en/document/read/38096532/p3-business-case-development-guide-ppp-canada. [Accessed 10 July 2022].
[69]
PPP Canada, "Identifying P3 potential: A guide for federal departments and agencies," PPP Canada, 2012.
[70]
A. Maly, "HOT or NOT: Does the Canadian Public-Private Partnership Legal Framework Attract Foreign Investment?," The Canadian Bar Association, 12 October 2021. [Online]. Available: https://www.cba.org/Sections/Construction-Law/Resources/Resources/2021/ConstructionEssayWinner2021. [Accessed 5 June 2022].
[71]
D. Penalver, "Public-Private Partnerships 2.0: Value for People and Value for Future," Getting Infrastructure Finance Right , 2 July 2020. [Online]. Available: https://blogs.worldbank.org/en/ppps/public-private-partnerships-20-value-people-and-value-future#:~:text=Public%2DPrivate%20Partnerships%202.0%3A%20Value%20for%20People%20and%20Value%20for%20Future,-Domingo%20Pe%C3%B1alver%20July&text=Traditionally%2C%20d. [Accessed 7 July 2023].
[72]
M. T. Ibanez, "Rightly done PPPs can be the right tool for green and resilient infrastructure," 01 July 2021. [Online]. Available: https://blogs.worldbank.org/en/ppps/rightly-done-ppps-can-be-right-tool-green-and-resilient-infrastructure. [Accessed 06 July 2023].
[73]
Infrastructure Ontario , "Our Public-Private Partnerships (P3) Model," 2024. [Online]. Available: https://www.infrastructureontario.ca/en/what-we-do/major-projects/our-p3-model/.
[74]
Alberta Infrastructure and Transportation , "Management Framework: Assessment Process," Alberta Infrastructure and Transportation , Alberta , 2006.
[75]
K. Reynolds, "Public-Private Partnerships in British Columbia," June 2018. [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://columbiainstitute.eco/wp-content/uploads/2019/11/Columbia-Institute-P3s-in-BC-2018-June-7-WEB.pdf. [Accessed 2022 February 2].
[76]
SaskBuilds, February 2016. [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/http://www.saskbuilds.ca/alternative-financing/SaskBuilds%20P3%20Project%20Assessment%20and%20Procurement%20Guideline%20-%20revised%202016.pdf. [Accessed 20 May 2022].
[77]
K. M. J. M. L. S. Ilan Dunsky, "Public-Private Partnerships: the case for enhanced collaboration in Canadian infrastructure projects," Lexpert| Business of Law, 29 September 2021. [Online]. Available: https://www.lexpert.ca/legal-insights/public-private-partnerships-the-case-for-enhanced-collaboration-in-canadian-infrastructure-projects/360008. [Accessed 2022 February 2].
[78]
M. Siemiatycki, "Public-Private Partnerships: Is a reassessment underway?," Ontario 360 , Ontario , 2023.
[79]
Infrastructure Ontario, "Assessment of Innovation through AFP," Atlus Group, Ontario, 2015.
[80]
S. Enoch, "Is There Value in Value for Money Assessments: Testing the VfM Test in Western Canada," Canadian Centre for Policy Alternatives: Saskatchewan Office, Saskatchewan , 2021.
[81]
Infrastructure Ontario , "Trillium Health Partners Broader Redevelopment – The Peter Gilgan Mississauga Hospital," [Online]. Available: https://www.infrastructureontario.ca/en/what-we-do/projectssearch/trillium-health-partners-broader-redevelopment--the-peter-gilgan-mississauga-hospital/. [Accessed 25 January 2024].
[82]
Organisation for Economic Co-Operation and Development , "Getting Infrastructure Fight: The Ten Key Governance Challenges and Policy Options," Organisation for Economic Co-Operation and Development , Paris, 2016.
[83]
S. B. A.-K. M. S. M.-D. Ata ul Musawir, "Project governance and its role in enabling organizational strategy implementation: A systematic literature review," International Journal of Project Management, vol. 38, no. 1, pp. 1-16, 2020.
[84]
United nations economic commison for europe , "Guidebook on Promoting Good Governance in Public-Private Partnerships," United Nations, New York and Geneva, 2008.
[85]
S. H. Yingqi Song, "Influence of Project Governance Mechanisms on the Sustainable Development of Public-Private Partnership Projects: An Empirical Study from China," Buildings, vol. 13, no. 10, p. 2424, 2023.
[86]
Ontario Infrastructure and Lands Coporation, "Project Agreement: Finch west LRT project," Infrastructure Ontario, Ontario, 2018.
[87]
Alberta Infrastructure, "Schedule 9: Form of Tri-Party Agreeemnt," Alberta Infrastructure, Edmonton, 2010.
[88]
M. J. G. Geert Dewulf, "Responsive governance in PPP projects to manage uncertainty," Construction Management and Economics, vol. 38, no. 4, pp. 383-397, 2020.
[89]
S. S. Alie, "Project governance: #1 critical success factor," in PMI® Global Congress 2015—North America, Orlando, FL, 2015.
[90]
Canadian Construction Documents Committee, "Documents," [Online]. Available: https://www.ccdc.org/documents/. [Accessed 5 February 2024].
[91]
European PPP Extertise Centre, "Role and Use of Advisers in preparing and implementing PPP projects," European PPP Extertise Centre, Luxembourg, 2014.
[92]
B. M. C. M. H. G. Q. S. Xue Lin, "Stakeholders’ influence strategies on social responsibility implementation in construction projects," Journal of Cleaner Production, vol. 235, pp. 348-358, 2019.
[93]
A. W.-F. a. J. Węgrzyn, "Understanding of Public–Private Partnership Stakeholders as a Condition of Sustainable Development," Sustainability, vol. 11, no. 4, p. 1194, 2019.
[94]
Constructive Edge and Canadian Council for Public private partnership, "P3s and Community Benefits Agreements in Canada," Constructive Edge, 2021.
[95]
ReNewCanada, 13 April 2021. [Online]. Available: https://www.renewcanada.net/feature/cbas-beneficial-building-trend/. [Accessed 15 January 2023].
[96]
Canada Green Building Council , "LEED: The global standard in green building," [Online]. Available: https://www.cagbc.org/our-work/certification/leed/. [Accessed 30 January 2023].
[97]
Canadian Green Building Council, "Zero Carbon Building Standards," 2024. [Online]. Available: https://www.cagbc.org/our-work/certification/zero-carbon-building-standard/. [Accessed 2024].
[98]
Canada Green Building Council , "Project Database," [Online]. Available: https://leed.cagbc.org/LEED/projectprofile_EN.aspx. [Accessed 25 January 2023].
[99]
Canadian Council of Public private partnerships, "Celebrating the Best in Canadian Infrastructure: National Awards," 2023. [Online]. Available: https://www.pppcouncil.ca/what-do-we-do/national-awards. [Accessed 19 December 2023].
[100]
K. Friedrich, "A systematic literature review concerning the different interpretations of the role of sustainability in project management," Management Review Quarterly, vol. 73, no. 1, pp. 31-60, 2021.
[101]
R. C. Oliver Laasch, Principles of Responsible Management: Glocal Sustainability, Responsibility, Ethics, Cengage, 2015.
[102]
R. Alvarez Tinoco, C. Sato and R. Hasan, "Responsible project management: Beyond the triple constraints," Modern Project Management, vol. 4, no. 1, pp. 81-93, 2016.
[103]
C. B. a. B. M. Ira Kay, "Harvard Law School Forum on Corporate Governance: The Stakeholder Model and ESG," 14 September 2020. [Online]. Available: https://corpgov.law.harvard.edu/2020/09/14/the-stakeholder-model-and-esg/. [Accessed 27 February 2024].
[104]
J. X. O.-K. R. A. S. K. Isaac Akomea-Frimpong, "Public-private partnerships for sustainable infrastructure development in Ghana: A systematic review and recommendations," Smart and Sustainable Built Environment , vol. 12, no. 2, pp. 237-257, 2023.
[105]
S. H. X. L. Guoli Feng, "Project Sustainability and Public-Private Partnership: The Role of Government Relation Orientation and Project Governance," Sustainability , vol. 14, no. 2, p. 4724, 2022.
[106]
B. L. a. T. S. Bin Xue, "What Matters in Achieving Infrastructure Sustainability through Project Management Practices: A Preliminary Study of Critical Factors," Sustainability, vol. 10, no. 12, 2018.
[107]
K. V. T. B. Marlies Hueskes, "Governing public–private partnerships for sustainability: An analysis of procurement and governance practices of PPP infrastructure projects," International Journal of Project Management, vol. 35, no. 6, pp. 1184-1195, 2017.
[108]
J. L. D. W. H. L. G. W. J. Y. Bingsheng Liu, "Public–private partnerships: a collaborative framework for ensuring project sustainable operations," Engineering, Construction and Architectural Management, vol. 31, no. 1, pp. 1-26, 2024.
[109]
Organization for Economic Co-operation and Development , "ESG Investing: Practices, Progress and Challenges," Organization for Economic Co-operation and Development , Winnipeg, 2020.
[110]
K. W. J. C. J. D. a. L. H. Will Sloan, "Valuing Sustainability in Infrastructure Investments: Market Status, Barriers and Oppourtunities: A Landscape Analysis," WWF Switzerland and Cadmus Group , Switzerland, 2019.
[111]
Statistics Canada: Industrial Organization and Finance Division , "Environmental, Social and Governance Project and Indegenous Peoples: Engagement Report," Statistics Canada , Ottawa, 2023.
[112]
Government of Canada , "Basics of Environmental Assessment under the Canadian Environmental Assessment Act, 2012," 19 12 2023. [Online]. Available: https://www.canada.ca/en/impact-assessment-agency/services/policy-guidance/basics-environmental-assessment.html. [Accessed 2 April 2022].
[113]
Association of Consulting Engineering Companies and Strategies 4 Impact, "Understanding Public private partnerships in Canada," Strategies 4 Impact, Ontario, 2006.
[114]
Canadian Council of Public Private Partnerships, "Building North America’s first fully digital hospital," Canadian Council of Public Private Partnerships, Ontario .
[115]
Green Municipal Fund, "Helping municipalities create a sustainable and prosperous future," 2024. [Online]. Available: https://greenmunicipalfund.ca/.
[116]
Government of Canada , "Government of Canada: Green Bond Allocation : Report 2021-22," Government of Canada, Ottawa, 2023.
[117]
A. J. G. G. P. Prita Amalia Faiz, "A systematic review of the interrelation of administrative, Environmental, Social and Governance of Public-Private Partnerships (PPP) Spaceport Project in Biak, Papua, Indonesia," Journal of Infrastructure Policy and Development, vol. 7, no. 1, p. 1709, 2023.
[118]
A. C. a. J. Farrier, "Public–Private Partnerships for Environmental, Social, and Governance Projects: How Private Funding for Infrastructure Can Produce Mutual Benefits for Companies and the Public," Leveraging Sustainable Infrastructure for Resilient Communities, 2022.
[119]
PPIAF: Enabling Infrastructure Investment , "A PPP Screening Tool: PPP Support of the Nile Equatorial Lakes Subsidiary Action Program," Nodalis Conseil, Washington , 2017.
[120]
G. Odu, "Weighting Methods for Multi-Criteria Decision Making Technique," Journal of Applied Sciences and Environmental Management, vol. 23, no. 8, pp. 1449-1457, August 2019.
[121]
C. Yin, "A Brief Summary of Subjective Weighting Methods in MCDM," 3 September 2020. [Online]. Available: https://www.linkedin.com/pulse/brief-summary-subjective-weighting-methods-mcdm-chonghua-yin/. [Accessed 17 March 2024 ].
[122]
S. A. a. M. P. B. Büşra Ayan, "A Comprehensive Review of the Novel Weighting Methods for Multi-Criteria Decision-Making," Information , vol. 14, no. 5, p. 285, 2023.
[123]
Partnerships British Columbia, "Methodology for Quantitative Procurement Options Analysis Discusiion Paper," Partnerships British Columbia, British Columbia, 2014.
[124]
M. M. Hamed Taherdoost, "Multi-Criteria Decision Making (MCDM) Methods and Concepts," Encyclopedia, vol. 3, no. 1, pp. 77-87, 2023.
[125]
M. T. ·. M. S. ·. F. J. Santos-Arteaga, "Analytical hierarchy process: revolution and evolution," Annals of Operations Research, vol. 326, no. 2023, pp. 879-907, 2021.
[126]
M. H. S. A. a. T. Z. Mohamed Assaf, "A Multi-Criteria Decision-Making Model for Selecting the Best Project Delivery Systems for Offsite Construction Projects," Buildings , vol. 13, no. 2, p. 571, 2023.
[127]
M. I. A. Khalil, "Selecting the Appropriate Project Delivery Method Using AHP," International Journal of Project Management, vol. 20, pp. 469-474, 2002.
[128]
T. L. Saaty, "Decision Making - The Analytical Hierachy and Network processes (AHP/ANP)," Systems science and systems engineering, vol. 13, no. 1, pp. 1-35, 2004.
[129]
Canadian council for Public Private Partnerships, "Celebrating the Best in Canadian Infrastructure: National Awards," 2024. [Online]. Available: https://www.pppcouncil.ca/what-do-we-do/national-awards. [Accessed 2023 June 1].
[130]
S. R. A. P. a. B. D. Zorica Dodevska, "When Fairness Meets Consistency in AHP Pairwise Comparisons," Mathematics, vol. 11, no. 3, 2023.
[131]
R. I. S. A. H. I. I. K. Ummu Hani’ Hair Zaki, "Prioritized Text Detergent:Comparing Two Judgment Scales of Analytic Hierarchy Process on Prioritizing Pre-Processing Techniques on Social Media Sentiment Analysis," Baghdad Science Journal, vol. 21, no. 2, pp. 662-683, 2024.
[132]
K. Goepel, "Implementation of an Online Software Tool for the Analytic Hierarchy Process (AHP-OS)," IJAHP Article: Goepel/ Implementation of an online software tool for the Analytic Hierarchy Process (AHP-OS)International Journal of the Analytic Hierarchy Process, vol. 10 , no. 3, pp. 469-487, 2018 .
[133]
K. D. Goepel, "Comparison of Judgment Scales of the Analytical Hierarchy Process — A New Approach," International Journal of Information Technology & Decision Making, vol. 18, no. 2, pp. 445-463, 2019.
[134]
T. L. Saaty, "How to make a decision: The analytic hierarchy process," European Journal of Operational Research, vol. 48, no. 1, pp. 9-26, 1990.
[135]
K. D. Goepel, "BPMSG: Comparison of Judgment Scales of the Analytical Hierarchy Process - A New Approach," 20 May 2018 . [Online]. Available: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://bpmsg.com/wordpress/wp-content/uploads/2018/05/2018-05-10-AHP-Judgm-Scales-blog.pdf. [Accessed 17 December 2023].
[136]
M. S. F. J. S.-A. Madjid Tavana, "Analytical hierarchy process: revolution and evolution," Annals of Operations Research, vol. 326, no. 2023, pp. 879-907, 2021.
[137]
Niagara Health , "What is the South Niagara Hospital?," 2024. [Online]. Available: https://www.niagarahealth.on.ca/site/south-niagara-about. [Accessed 2024].
[138]
A. C. Rosas, "Construction of new hospital in Niagara begins after concerns over staffing, urgent care closures," 19 july 2023. [Online]. Available: https://www.cbc.ca/news/canada/hamilton/south-niagara-hospital-construction-1.6910134.
[139]
CCPPP, "Nine projects shortlisted for 2023 National P3 Awards," 2024. [Online]. Available: https://www.pppcouncil.ca/news/nine-projects-shortlisted-for-2023-national-p3-awards. [Accessed 2024].
[140]
Plenary , "South Niagara Hospital," 2024. [Online]. Available: https://plenary.com/project/south-niagara-hospital. [Accessed 2024].
[141]
Infrastructure Ontario, "South Niagara Hospital," 2024. [Online]. Available: https://www.infrastructureontario.ca/en/what-we-do/projectssearch/south-niagara-hospital/#pAboutTheProject. [Accessed 2024].
[142]
WELL, "WELL v2," 2023. [Online]. Available: https://v2.wellcertified.com/en/wellv2/overview. [Accessed 30 March 2024].
[143]
Metrolinx, "Finch West LRT," 2024. [Online]. Available: https://www.metrolinx.com/en/projects-and-programs/finch-west-lrt/what-were-building. [Accessed 2024].
[144]
City News Everywhere, "Metrolinx staff ‘very confident’ Finch West LRT will open in 2024 after recent work," 27 December 2023. [Online]. Available: https://toronto.citynews.ca/2023/12/27/finch-west-lrt-2024-opening-metrolinx/. [Accessed 18 Januray 2024].
[145]
Infrastructure Ontario, "Value for money Assessment: Finch west light rail transit," Infrastructure Ontario, Ontario, 2018.
[146]
Infrastructure Ontario, "Finch west LRT project agreement," Infrastructure Ontario, Ontario, 2018 .
[147]
Government of Canada , "Private Sector Engagement for Sustainable Development," 6 1 2023. [Online]. Available: https://www.international.gc.ca/world-monde/issues_development-enjeux_developpement/priorities-priorites/fiap_private_sector-paif_secteur_prive.aspx?lang=eng. [Accessed 1 12 2023].
[148]
PwC Canada , "Making the most of green tax and incentive programs," 2022. [Online]. Available: https://www.pwc.com/ca/en/today-s-issues/environmental-social-and-governance/green-tax-and-incentive-programs.html. [Accessed 2023].
[149]
Government of Canada , "Government of Canada: Green Bond Framework," Government of Canada, Ottawa, 2022.
[150]
"The Green Book: Central government guidance on Appraisal and Evaluation," 2018. [Online]. Available: https://iaac-aeic.gc.ca/050/documents/p65505/125818E.pdf. [Accessed 2024].
[151]
Bank of Canada , "Bank of Canada Disclosure of Climate-Related Risks 2022," Bank of Canada , Ottawa, 2022.
[152]
Council of Canadian Academies, "Canada’s Top Climate Change Risks:The Expert Panel on Climate Change Risks and Adaptation Potential," Council of Canadian Academies, Ottawa, 2019 .
[153]
Delphi Group , "Circular Economy & The built environment sector in Canada," Delphi Group , Ottawa, 2021.
All items in Spectrum are protected by copyright, with all rights reserved. The use of items is governed by Spectrum's terms of access.

Repository Staff Only: item control page

Downloads per month over past year

Research related to the current document (at the CORE website)
- Research related to the current document (at the CORE website)
Back to top Back to top