Optimized scheduling for repetitive construction projects

Title:

Optimized scheduling for repetitive construction projects

El-Rayes, Khaled A (1997) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University.

[thumbnail of NQ40315.pdf]
Preview
Text (application/pdf)
NQ40315.pdf
9MB

Abstract

An object-oriented model is presented for optimized scheduling of repetitive construction projects such as: high-rise buildings, housing projects, highways, pipeline networks, bridges and tunnels. The model provides a number of practical features, and incorporates newly developed algorithms for scheduling of repetitive construction projects including: (1) a resource-driven scheduling algorithm for repetitive activities; (2) an interruption algorithm; and (3) an optimization procedure. The scheduling algorithm identifies the scheduled start and finish times as well as the assigned crew for each unit of a repetitive activity. The algorithm provides a schedule that complies with precedence relationships, crew availability and crew work continuity constraints, and considers the impact of a number of practical factors commonly encountered during scheduling. The interruption algorithm generates feasible interruption vectors for each repetitive activity in the project and provides added advantage over available formulations that consider arbitrary user-specified interruption vectors. The optimization procedure is based on a dynamic programming formulation. Unlike available dynamic programming formulations, the present formulation is capable of incorporating cost in the optimization process, thus offering valuable support to project team members in minimizing the overall cost of the project. For each repetitive activity in the project, the present model assists the planner in selecting the optimum crew formation and interruption vector from a set of possible alternatives. As such, the model can be used to evaluate the impact of different project acceleration strategies (i.e. multiple crews, increased crew size, overtime policies, or additional shifts) on the overall cost. The present model is implemented as a prototype software system. The system is developed as a 32-bit windows application that supports user-friendly interface including menus, dialog boxes, and windows. A number of application examples are analyzed to illustrate the use of the model and demonstrate its capabilities. The model can be used as a decision support system for generating optimized schedules for repetitive construction projects. This should contribute to cost-effective delivery of constructed projects.

Divisions:Concordia University > Gina Cody School of Engineering and Computer Science > Building, Civil and Environmental Engineering
Item Type:Thesis (PhD)
Authors:El-Rayes, Khaled A
Pagination:xx, 240 leaves : ill. ; 29 cm.
Institution:Concordia University
Degree Name:Ph. D.
Program:School for Building
Date:1997
Thesis Supervisor(s):Moselhi, Osama
Identification Number:TH 438.4 E47 1997
ID Code:411
Deposited By: Concordia University Library
Deposited On:27 Aug 2009 17:11
Last Modified:13 Jul 2020 19:46
Related URLs:
All items in Spectrum are protected by copyright, with all rights reserved. The use of items is governed by Spectrum's terms of access.

Repository Staff Only: item control page

Downloads per month over past year

Research related to the current document (at the CORE website)
- Research related to the current document (at the CORE website)
Back to top Back to top