Login | Register

An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non- Repetitive Construction Projects

Title:

An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non- Repetitive Construction Projects

Hussein, Bahaa (2019) An Evolutionary Stochastic Discrete Time-Cost Trade-Off Method for Repetitive and Non- Repetitive Construction Projects. PhD thesis, Concordia University.

[thumbnail of Hussein_PhD_F2019.pdf]
Preview
Text (application/pdf)
Hussein_PhD_F2019.pdf - Accepted Version
Available under License Spectrum Terms of Access.
12MB

Abstract

This thesis aims at developing a method for solving the scheduling problem of discrete Time-Cost Trade-off (TCT) in an uncertain context. The method determines the elite execution mode for each project activity to optimize for minimization of the overall project’s cost and/or duration while satisfying a specified Joint Confidence Level (JCL) of both time and cost. In this thesis, each resource allocation to individual activities is referred to as mode, and each alternative solution is referred to as a chromosome. A new evolutionary method formulation is developed. The method is of two-folds, the first is an experimental module where generations of chromosomes are developed using a design of experiments and blocking techniques based on a novel approach of partitioning the project scheduling network. At each generation, a complete enumeration is performed for a selection of primary activities, and the elite modes are identified and carried forward to successive generations until all elite modes are identified to form the elements of the supreme chromosome solution. To provide flexibility and practicality, the developed method allows for the end-user interactive selection of execution modes. This arises from the bias of project managers in favouring specific modes that may not be optimal. Hence, the second fold of the developed method is a random search module that quantifies the effect of changing a mode within a chromosome on the total project cost and duration under a targeted JCL of both time and cost. The method also accounts for penalties/ incentives as a function of time associated with the late/ early project completion depending on the contract provisions. The developed method is also extended for repetitive construction projects considering optimization of crew work continuity for typical and non-typical repetitive activities, i.e. those having identical work amounts and those having a deviation in their work amounts and, therefore, different cost and duration in different repetitive units. The supreme chromosome solution and the main effect plots provide the decision-maker a guideline for making well-informed implementation strategies. The performed computational results demonstrate not only the method benefits and accuracy but also its superiority over current methods for stochastic TCT optimization. The method has been fully coded using Google Apps Script, Google BigQuery SQL statements, and in-line JavaScript functions.

Divisions:Concordia University > Gina Cody School of Engineering and Computer Science > Building, Civil and Environmental Engineering
Item Type:Thesis (PhD)
Authors:Hussein, Bahaa
Institution:Concordia University
Degree Name:Ph. D.
Program:Building Engineering
Date:July 2019
Thesis Supervisor(s):Moselhi, Osama
ID Code:985943
Deposited By: BAHAA HUSSEIN
Deposited On:25 Jun 2020 18:12
Last Modified:25 Jun 2020 18:12
All items in Spectrum are protected by copyright, with all rights reserved. The use of items is governed by Spectrum's terms of access.

Repository Staff Only: item control page

Downloads per month over past year

Research related to the current document (at the CORE website)
- Research related to the current document (at the CORE website)
Back to top Back to top